incinerator for medical waste.Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc.). a  diesel  fired  medical  waste  incinerator  with  a  capacity  of  300Kg/hr.  to  be  installed  at  a  waste  disposal  site  away  from  populated  areas.

Standards
1) Bidder or Manufacturer ISO 9001 Certified
2) Respecting international emission standards
Electrical characteristics
3) A 230V, 60Hz single-phase electrical source.
4) Protections against over-voltage and over-current line conditions.
5) Compliance with applicable Ghanaian standards and regulations.
Operational characteristics
6) Two-stage incineration with dual chamber combustion.Incinerator with Oil Burner .
Require Quantity – 1 complete Unit / Set
Type of Materials To  be Burn –  Solid Waste
Burner Capacity  – 0.2 Kw ( 200 watts )
Capacity   –  2 ton per day
Oil Tank capacity of Burner – 300 Lit
Oil pump capacity   – 0.4 Kw ( 400 watts ).medical waste Incinerators for burning hospital waste
so we are looking for a source

university hospital incinerator manufacturers



The Incinerator Plant is outcome wastes incineration from Different petrochemical devices. In this task we desire to blaze all result wastes from petrochemical gadgets and also additionally produced high stress steam from heater plant heat produced.
In the starting outcome waste from petrochemical collects as well as also moves to transit as well as additionally setting up center in various types. Input feeds of heater plant are gotten listed below table:

health center incinerator suppliers, Waste streams of petrochemical device gather and additionally keep en path and also Arranging Facility.
En Path as well as Planning Facility one lab demand to be taken into consideration.
In this center, waste will be identified in 2 groups:
–– – –– Improper for burning
– – Wastes that can be gone back to petrochemical.
Appropriate wastes are recognized right into both categories: –– – Input wastes to revolving kiln, consist of solids as well as likewise waste fluids.
–– – – Input wastes to fixed kiln, include clean fluids as well as likewise gasses.
All strong wastes should be moved to storage area pit from Transport along with Sorting. Solid wastes storage space pit is input of rotating kiln.
All liquid wastes require to be maintained and kept in Transit as well as Arranging. All storage space as well as stablizing tools or center have actually to be taken into factor to consider.
Storage and stablizing capacity requirement to be considered based on worst circumstances (shut down).
Normally burner plant contains 2 similar trains (capability of each train is 100%). Each train contains a rotary kiln as well as a dealt with kiln.



Animal Waste Incinerator


Basic Info.

Model NO.:dual chamber medical waste incinerator specific
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Product Description

The factory workshop local in liuhe Economic Development Zone, suburb of Nanjing and business division local in downtown region. Presently, incinerator line products market cover former Soviet Union region, Africa states, Asia states and Middle East region.  From year 2010, we negotiated with updated technologies from Europe and America manufacturers and establish cooperation relationship in the land of China market. Unfortunately, competition in different countries market, country discrimination and anxieties of intellectual property rights trigger failure finally. Presentlywe investment more attempt, funding and technology development in our own brand, we are to be one of the most significant incineration equipment in the world. We have trading branch company for expert export business support.

The factory workshop local in liuhe Economic Development Zone, suburb of Nanjing and business office local in downtown area. Presently, incinerator line products market cover former Soviet Union area, Africa countries, Asia countries and Middle East area. 
From year 2010, we negotiated with updated technology from Europe and America manufacturers and establish cooperation relationship in the territory of China market. Unfortunately, competition in other countries market, country discrimination and worries of intellectual property rights cause failure finally. Presently, we investment more effort, funds and technology development in our own brand, we are to be one of the largest incineration equipment in the world. We have trading branch company for professional export business service.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

100 Kgs Per Hr Medical Waste Incinerator


Product Description

Nanjing Clover Medical Technology Co., Ltd..

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

YD incinerator is latest layout for waste treatment, include health care waste, animal cremation and other solid waste. This gear quality structural for types of website, like hospital, hospital waste incinerators, hospital waste incinerators china, hous hol waste incinerator technology, how to apply for an incinerator licence in south africa, environmental division, animal cremation bureaus, etc.. CLOVER Incinerator supply updated models with dual combustion room, mix combustion space and smoke filter room using refractory lines, and the combustion room temperature up to 1200 deg C.

double chamber incinerator

Waste calorific value : 4000KCAL/KG
Moisture Content : 10-25%
Nominal Capacity : 50Kg/Hour batch load
Secondary Chamber : 2 Seconds @ 850degrees C
The primary combustion chamber must ensure minimum exit temperature is not less than 850 degrees C.

INSULATION
Calcium Silicate
Limiting Continuous service limit 1000 degrees C.
Thickness 25mm

THROUGHPUT
50kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of 120kg/MCubed for general waste and 160kg/MCubed for health care waste.All types of chemicals substances (Biocides) that utilized for Oil operation sites (water base Drilling, oil operating facilities for the corrosion and others: The examples of the biocides are “WS-36, HAI-85M, SODA ASH, DSMA, MICRO MATRIX, CALCIUM CARBONATE FINE, BARAKLEAN, GILSONITE, MIXED WASTE SOIL CHEMICALS, ZINC CARBONATE, CAUSTIC SODA, ENVIROTHIN, BARAZAN D,..etc) as well as the substances are liquid and solid.

2. In regards to the quantity of burning the waste, it could be 200 – 500 kg per hour.

3. Our Operational time can be in Day and can be at night.

4. Can you please give me the cost of unit operated with Diesel  and Gas.The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate insulation and a hot face combination of super duty brickwork or high strength castable.
The primary combustion chamber must ensure minimum exit temperature is not less than 850°C.
One Manual Load Incinerator comprising:
·???????? Manual Loading door
·???????? Horizontal solid hearth, refractory lined primary combustion chamber. Approximate dimensions 800 mm diameters x 2100mm long
·???????? Full sized bulk load/ash removal door
·???????? 1 off diesel-fired ignition burner — temperature controlled
·???????? 1 off combustion air supply fan and distribution system, automatic control
·???????? High capacity secondary combustion chamber with residence time not less than 2 seconds @ >850°C
·???????? 1 off diesel-fired afterburner — temperature controlled
·???????? Control panel — automatic operation
e????? Temperature indication primary and secondary chambers 0-1200°C
e????? Refractory lined flanged chimney to a height of 10M above ground level

HIGH TECH PYROLYTIC MEDICAL WASTE INCINERATOR

HIGH TECH PYROLYTIC MEDICAL WASTE INCINERATOR

1.   Capacity of destruction in weight: 60 Kg/h.
2.   It should be able to operate not less than 10 hours/day
3.  This incinerator must be able to destruct all combustible wastes produced by hospitals,
private clinics, laboratories, institutes, etc…
4.  Design Specification : Types A, B, C, D, and E of medical waste
5.  PYROLYTIC” combustion, by controlling the gasification of waste.
6.  The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the
loadings.
7.   It should be able to reduce the volume of wastes by 98%.
8.   It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9.  The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
•    The Temperatures of combustion: Minimum will be 850°C and max 1400°C
•    Post combustion: > 1100°C.
11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70×70.
14. Burner operation should be Automatic On/Off
15. Fuel: diesel
16. The supplier must provide necessary information for the best of the installation This incinerator
with “PYROLYTIC” combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch
Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and
stuffing insulating out of refractor.-.
* The insulation of the combustion chamber should be composed of refractory bricks,
having a high content of aluminium and insulates bricks in order to assure a minimum
temperature on the outside sheet metal.
* Composition of the refractory;
•    Refractory concrete:
> Thickness: > 100 mm ”
> Nature: 42% of A1203
•    Insulate in fibrous panels :
> Thickness: > 75 mm
> Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging
flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice
gate of regulation and isolating valve.
*  Plate of combustion in Carborundum, avoiding the fixing of glass and slags.

18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
•    Refractory concrete :
> Thickness: > 150 mm
>  Nature: 65% of A1203
•    Insulate in fibrous panel:
>  Thickness: > 85 mm
>  Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of
electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating
valve.
* A secondary injection of air to ensure perfect oxygen content.

19. A control box ensuring the complete cycle of combustion.

20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being
carried out by valves and following the control of the automatic cycle.

21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion,
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing
should be Automatic or manual batch de ashing.

22. Process Filtering system: Scruber to be mentionned as optional

23. Emission Standards Compliance: BS 3316 or equivalent standard

23. Capacity to treat Plastic: Not less than 40% by weight

24. CE Manufacturing Compliance: BS EN 746-2-1997

22. The supplier must give batches of spare parts of first urgency and consumable of the
incinerator.

23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perforn an onsite installation of the incinerator.

25. The technical training of operators will have to be provided and given by a technician from the
factory; it will consist of curative and preventive maintenance, and the use of machine, etc

NB.; Civil works and any other related services for the installation and training of operators must be included in the incinerator’s price.

Specification for the shelter of the incinerator:

House of the incinerator inclusive in offer (the house must have toilet and hand washing facilities and firefighting). The size of the shelter shall measure four meter by six meter and shall be provided with adequate air ventilation.

This material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG

Ebola: Southport Company leading the fight in International health Catastrophe


“Their engineers typically head out to aid with installation but as a result of the Ebola threat, engineers utilized by aid agencies and organisations are being delivered to be trained up at the plant at Canning Road Industrial Estate rather than But we are geared toward all these things, anyhow. The previous time demand was similar to this was the Iraq War. We have set up a separate plant so when it will happen we could handle it.”

British Army medics have been shipped to Sierra Leone yesterday as global leaders promised to measure the global community’s attempts to halt the spread of the disease which has up to now taken over 4,000 lives.

Sales and marketing manager Paul Niklas said they’d over a hundred orders from global organisations and aid agencies, such as the United Nations and the Red Cross.

He said most of their work force was dedicated to manufacturing the incinerators.

Mr Niklas explained:”We feel really proud of the fact they have come to us and we have a item that is part of the solution.

“Since this has to be contained at the origin.

“As soon as you begin trying to move waste, it can spread further and farther.

“Our incinerators burn 850 degrees Celsius which burns the toxins, then from the second chamber they burn the gases out of that at 1,200 degrees so what’s coming from the chimney is clean.

“Along with our incinerators are mobile, also, so they can be carried to the source”

British Army medics were sent to Sierra Leone yesterday as global leaders promised to step up the international community’s efforts to halt the spread of the disease which has so far taken more than 4,000 lives.


PROGRESSED MEDICALWASTE HEATER



Incinerator design A.
Burn Rate 65kg/h minimum.
Weight (kg), please recommend:.
Second Chamber.
Gas Retention Time – – – – 2 Secs. Power Supply – for – Control Box – 220V-240V 50Hz solitary stage.
10m Pipe Pipeline, show size. I000 Litre Gas Container+ Pipeline System, show quantity.
Included chimney expansion, suggest elevation. Guarantee, indicate no of years. The minimum combustion temperature degree of the main chamber will certainly not be less than 800 degrees C;

Second combustion.
The residence time in the second chamber will not be much less than 2 seconds;.
The gas temperature degree as determined versus the within wall surface area in the second chamber, not in the fire location, will not be a lot less than as received Lots 1-7;.
Both the major as well as the 2nd temperature degrees will certainly be maintained till all the waste has been entirely ignited;

Smokeshaft.
The smokeshaft will have a marginal elevation of 4 meters over ground degree;.
The minimal leave rate of the discharges shall not be less than 10 metres/second;

Temperature Level Warnings.
When the secondary temperature drops to detailed below the required temperature level;

General, a noticeable and/or distinct alarm system to encourage the driver.
Control box can be gotten rid of in addition to placed on different stand at least 1.5 meters from incinerator at around 1.6 meter elevation;

Great Deal 2.
Point 5 Burner design B.
Burn Price 150kg/h minimum.
Weight (kg), please suggest:.
Extra Chamber.
Gas Retention Time – – – – 2 Seconds. Diesel/LPG/LNG, please suggest.
One year Spare Parts Package for complete maintainability.
Thing 6 10m Tube pipe Pipeline, indicate dimension.
Item 7 I000 Litre Gas Tank + Pipeline System, suggest quantity.
Item 8 Included smokeshaft extension, show altitude.
Warranty, show no of years.
Large amount 3.
Point 9 Incinerator layout C.
Burn Rate 250kg/h minimum.
Weight (kg) please indicate:.
2nd Chamber.
Gas Retention Time 2 Secs.
Gas Diesel/LPG/LNG, please show.
Power Supply for Control Box 220V-240V 50Hz single stage.
Minimum operating temperature level 920 ° C, please indicate.
One year Spare Components Bundle for complete maintainability.
Product 10 10m Tube pipeline Pipeline, show length.
Thing 11 I000 Litre Gas Container + Pipeline System, indicate volume.
Thing 12 Extra chimney extension, reveal height.
Guarantee, indicate no of years.
Lot 4– – Warm Waste Burner.
Point 13 HTW Burner style D.
Burn Price – – – – 150kg/hour minimum. Weight( kg), please show:.
Additional Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please suggest.
Power Supply for Control Box 220V-240V, solitary phase 50-60Hz.
Minimum running temperature level 1200 ° C, please show.
One year Spare Components Package for complete maintainability.
Thing 14 10m Hose pipeline Pipe, suggest size.
Item 15 1000 Litre Gas Tank + Pipeline System, reveal amount.
Product 16 Added smokeshaft development, reveal elevation.
Solution guarantee, reveal no of years.
Good deal 5– – Mobile Burner. 2. Incinerator gives 2 chamber incineration in addition to holds gasses for a minimum of 2 seconds.
3. Each incinerator needs to have appropriate labelling for parts/areas of high job health and wellness threat on the incinerator.
& & Country Issues, or European Union regulations and guidelines.

Item 17 Mobile Burner version E.
Burn Rate Price minimum.
Weight (kg), please show:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Gas – Diesel/LPG/LNG, please program. Power Supply for – Control Box – 220V-240V 50Hz single stage. Minimum operating temperature level 850 ° C, please program. One year Spare Parts Bundle for complete maintainability. Product 18 10m Hose pipe Pipeline, reveal
dimension. Item 19 1000 Litre Gas Storage Tank + Pipeline System, show volume.
Item 20 Extra chimney expansion, suggest height.
Great deal 6– – Mobile Burner.
Item 21 Mobile Burner design F.
Burn Price 100kg/h minimum.
Weight (kg), please suggest:.
Additional Chamber.
Gas Retention Time – – – – 2 Secs. Gas – Diesel/LPG/LNG, please suggest –. Power Supply – for – Control Box – 220V-240V 50Hz solitary phase. Minimum running temperature level 850 ° C, please recommend. One year Spare Components Plan for full maintainability.
Item 22 10m Hose pipe Pipe, show size.
Point 23 1000 Litre Gas Tank + Pipeline System, recommend quantity.
HTW Mobile Burner style G.
Burn Price 100kg/h minimum.
Weight (kg), please indicate:.
Extra Chamber.
Gas Retention Time – – – – 2 Seconds. Fuel – Diesel/LPG/LNG, please show.
Power Supply for Control Box – – – – 220V-240V 50Hz singular phase.
Minimum running temperature level 1200 ° C, please suggest.
One year Spare Parts Package for total maintainability.
10m Pipeline Pipeline, show size.
1000 Litre Gas Storage Tank + Pipeline System, suggest volume