Incinerator (YD-30C)


Product Description

Nanjing Clover Medical Technology Co., Ltd..

Program Scope:  1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. 3. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation 

Equipment Technical Specifications
Model YD-30C
Feed Capacity 50-100 kgs per feed
Burning Rate 30 kgs per hour
Burning Time per Feed 1.5-3 hours
Voltage 220V
Power 0.59Kw
Fuel Natural Gas or Diesel oil
Burner ItalyBurner
Feed Mode Manual
Fuel consumption (Oil) 10.2-20.0 Kgs/Hour
Fuel consumption (Gas) 12.2-24.0m3/Hour
External Dimensions 170 x 140 x 190cm (mainbody)
Internal Dimensions 55 x 55 x 85cm(Primary Chamber)
Waste combustion chamber 250Liters
Post Combustion Chamber 140Liters
Oil Tank Capacity 100 Liters
Door Opening 38 x 48cm
Chimney 5.0M
Gross Weight 1800kgs
Chamber Material Refractory Concrete
Max. Heat Value 200,000Kcal/Hr.
Operation Technical Specifications
Solid Chamber temperature 800 0 C -1000 0 C
Gas Chamber temperature 1000 0 C -1200 0 C
Chamber Anti-Rate 1350 0 C
Residency time 2.0 Sec.
Burning efficiency >98%
Waste Lower Calorific Power 3000Kcal

Key Features:  * All versions with Dual combustion room.  * Stainless Steel chimney/stack, long life. *according to sequence * High fever, long life of incinerator.  * Free or minimal installation onsite.  * High speed, from 10kgs to 500kgs per hour, up to 6ton daily.  * PLC Control Plane. *according to order  * New Design for pet animal cremation enterprise.  * One year guarantee on incinerator and parts in stock.

Another day at the waste incineration plant


The family waste is sorted in a perforated drum to size and then passes on large conveyor belts so-called magnetic seperators. They eliminate ferrous scrap. A second ferrous metallic residue as well as an automatic non-ferrous residue occur after combustion. They have been processed previously in external sorting, so they can be used right to the domestic and bulky waste. The various waste streams are mixed completely, since this homogenization ensures a top quality, a uniform as potential burnout and a good quality ash.
In a small group, we were led by the spokesman of the AVG through the respective segments of the garbage incineration plant and the procedures were explained in detail. Initially skeptical, since in prior years there was so much negative about this facility (excessive construction costs, lack of capacity), the disposition among the participants transformed slowly into fascination.

To clarify: It’s just about waste.

Truth and cleanliness

What I noticed during the tour: In the plant, each measure is carefully considered, it is worked with great precision. And even if that sounds paradoxical: it is squeaky clean! Just in the hallway where distinct wastes are mixed on conveyor belts, there is the typical smell of crap, but not as bad as originally expected.

Amazing for me: I didn’t understand that by using residual waste a very great deal of electricity is created. And reassuring for me: resources are won from the last fall: metal, material for road building, plaster at good quality. The proportion of what’s factually left and really not recycled, seems negligible to non.

From waste to electricity — the process in detail

The residual waste incinerator from Cologne was put to operation in 1998 and is among the most modern and best facilities in the world. It processes what’s landed from the residual waste after the individual collection of private households, as well as the remains of sorting from combined industrial and building waste.

a lot of the waste is sent by rail. The railway containers are loaded in two waste transfer stations in the city of Cologne and collectively have a capacity of about 250,000 tons each year. The remaining waste is attracted by truck.
The hot exhaust gas is used for electricity generation. This drives the downstream generator with which is produced electric power. For own use just a small region of the energy is needed. The increased part is provided in external electricity distribution networks. The amount of energy created in the incinerator is enough to power over 100,000 households.

In the combustion and the subsequent exhaust gas purification residual substances like dust and salts remain as well as ashes from the boiler. Gypsum is also a waste material, which can be obtained as a reaction product from the exhaust gas purification and contains construction material quality.

Emission control: the exhaust gases are almost completely neutralized from the procedure used in the Cologne incinerator. There is no waste water, as well as the legal requirements are obviously undercut.

Rethinking at waste management companies

Following the trip, I had the opportunity to talk to the media officer of AVG. In this dialog it became clear just how much the thinking has shifted within the sphere of waste management in recent decades and years. While during the 1960s to the 1990s garbage was piled up entirely unsorted in landfills and then abandoned, at the new millennium they’ve understood the value of the waste. Climate change and CO2 emissions have pushed as significant issues in focus for its residual waste processing. The heat generated during combustion is converted to electricity. Resources are recovered, as much as is technically possible. Especially metal, wood and plastics. The recovered plastic from residual waste is used for example as fuel for cement plants.

Waste incineration plant are now equatable to electricity plants, even when fuel value isn’t quite equivalent to the conventional fuels like coal, gas and oil. As an increasing number of municipalities have started to generate their own electricity by means of residual waste incineration, the significant electricity suppliers get in significant issues.

In the conclusion of the tour I was very impressed. That what’s put from the waste in private households plus the industrial waste is, after all, still god to supply 100,000 households with electricity in Cologne.

And in the same time it’s scary, what incredible tonnes of waste we produce. Blue and orange ton come in addition to that.

Client society offers garbage

Waste incineration plants producing electricity for us and making us less reliant on fossil fuels, would be the logical result of our society. However, incinerators are not built primarily to generate electricity. However, to become master of the hills of waste we create continuously as a society. Luckily, with modern incinerators, a method was shown to constitute the stinking issue a fresh thing. However, the cause, our ingestion, is the actual issue.

For the operators of the incineration plant, it is essential that enough waste is delivered. Garbage is their product. The more they could get, the better to your machine’s capacity. For then it will work cost-effectively, which then has a positive impact on the urban garbage fees. Since waste is inserted from adjoining areas.

However, the customer society provides those masses of garbage. Goods are produced in massive amounts, bought, used or consumed and eventually discarded. The 2aste incineration plant gets food — in 2013 there were 707,000 heaps in Cologne. Truly an ideal cycle, so one might believe. If not for this”but” would be. Because our conventional consumption goes at the cost of other countries, to the detriment of the environment, acceptable working conditions; Resources are wasted, the transport around the globe has impact upon the climate, production facilities in the Far East toxin the local surroundings and so forth.

WellI reside in Cologne, a big town, where certainly just a small proportion of residents believe about crap, disposal or perhaps waste reduction and practice this. Which may be a negative point of view, but I think it is realistic. The average normal citizen does not necessarily ask the question what’s really happening to that which he throws off in the span of a year. My next wish is to pay a visit to a recycling plant for plastics.

Waste incineration and waste seperation versus waste prevention

Waste separation was yesterday. The most recent approach is waste prevention. In its most distinct version it is called Zero Waste. No waste. So far there are just a few leaders, whose reports and videos I read and watch with interest. And in precisely the same time I wonder just how to implement this at a typical big-city life. It begins with the fact that — even if you use a togo box, that can be compostable, then you do not understand where to dispose of it along the way. So take it home and put it in the compost bin? Would everybody do that?

I think it’s good if it is possible, to be aware of the situation (massive quantities of waste) via a well organized disposal system and outside actually to convert this residual waste to a large extent to energy, ie heating and electricity. There is no less than a massive improvement as contrary to the stinking landfill from earlier, in which everything was thrown into a heap and then covered with the cloak of silence. The next step should be, to reduce the total amount of waste in total. And this will not be possible only from the civic society. Here politics and economy are requested to create the ideal framework and to set the operational execution in motion.

by: http://blog.upcycling-markt.de/en/blog/muellverbrennungsanlange-waste-incineration-plant.html

Lately a dream came true for me. This might appear strange. Sometimes I catch myself when I get stuck on documentary programs about recycling methods from the (rare) zapping through the TV channels. Clearly this subject fascinates me. Since I’m also quite interested in the subject Generation Y, I could kill two birds with one stone.
By the massive hallway of the conveyor belts the waste passes the so-called residual waste bunker. Here it is stored some time until enough moisture has dissipated, so it can burn well. By means of permanent humidity and temperature indicators it is controlled, in what condition the waste is. The waste moves on roller cubes throughout the boiler. And there it burns. The various”brand new” waste ignites from the burning garbage. So no additional external energy is necessary for the combustion process. The combustion takes place after the DC principle: The burning of waste and the waste gases proceed in precisely the same direction throughout the”hot flame” in the end of the grate. This process ensures that the destruction of pollutants like dioxins and furans are already performed from the combustion chamber.

From squander is made electricity for 250,000 individuals

And this is the highlight. The heat produced during combustion is used. On the one hand, to heat the local Ford plant. However, this is just a nice side effect. Nearly all the heat is converted to electricity by generators. And even that the power consumption of 250,000 individuals can be fulfilled. The waste incineration plant Cologne is thus basically a power plant also provides a quarter of the town of Cologne with electricity. That sounds amazing. And as you might find the notion it is not so bad when so much garbage is produced — because it is used so well…

After combustion bottom ash, hot gas and residues remain. These chemicals are mainly used again helpful: The ash is cooled with water and kept in an ash vine until it is processed at a bottom ash treatment plant and then utilized in road, landfill and landscaping.

I think it’s great if it is possible, to be master of the situation (immense amounts of waste) through a well organized disposal system and beyond even to convert this residual waste to a large extent into energy, ie electricity and heating. There is at least a huge improvement as against the stinking landfill from earlier, in which everything was thrown into a pile and then covered with the cloak of silence. The next step must be, to reduce the amount of waste in total. And this will not be possible just by the civil society. Here politics and economy are asked to create the right framework and to set the practical implementation in motion.

by: http://blog.upcycling-markt.de/en/blog/muellverbrennungsanlange-waste-incineration-plant.html


Mixed Biomedical waste Incinerator

Product              :Mixed Biomedical waste Incinerator
Quantity             :60 units
Contract period:To be decided by the supplier

Please confirm your willingness to execute this contract project by sending brochure and your price quotation for the below specification to enable us submit it to the firm incharge of the contract for their study and approval.

Type of Waste: Mixed Biomedical waste.

1. Waste burning capacity of unit: 100-125 kgs / hr.
2. Mode of waste handling : Autoloading– DFDV + Bucket elevator
3. Type of fuel : LDO / HSD
4. Type of Burner operation : Automatic
5. Expected fuel consumption: 30-35 kgs/hr **(depending upon overall
mix of the waste, moisture
content, etc.) after preheat.
6. Connected electrical load : Approx. 7-8 KW (AC 3 phase,220V, 50 Hz).
7. Overall space requirement : 9 m (L) X 8 m (W) X 6 m (H) Each unit
without stack

Burners temperature controlled (TIC – Thermocouple) and work on ON –
OFF basis. The frequency on ON – OFF will depend upon the nature of
waste, moisture content, calorific value, etc. and shall vary from waste to
waste. The fuel consumption also depends upon the frequency of the door
opening and method of operation of the incinerator. We have mentioned
approx. expected fuel consumption figures.

The Incineration System comprises of :

I. Main Incinerator with
A. Primary & Secondary Chamber Modules duly refractory lined, piped & wired.
B. Bucket elevator + DFDV mechanism for autoloading and Deashing
mechanism
II i. 1 No. fully automatic Fuel Oil burner for primary chamber.
ii. 1 No. fully automatic Fuel Oil burner for secondary chamber.
III. Centrifugal forced draft fan assembly complete with motor drive, duct and
dampers, etc. mounted on the common skid of the unit to provide :
Combustion air.

Eductor air.
IV. Eductor Assembly for :
Cooling of exhaust gases from 900 – 1000 0 C to around 350 0 C .
Keeping the entire system under negative pressure to avoid hot gases / dust
particles rushing out of charging door.
V. Electrical Control Panel along with safeties, and Audio / Visual
indicators and
/ or alarms for efficient and safe operation of the system.
VI. Electrical wiring of the unit.
VII. Oil tank of 1000 ltrs capacity mounted on the skid
VIII. Operating tools and tackles comprising of – rake, hoe, shovel (I No. each).
IX. Chimney of  2.5 Mtr height.

The 3 burners for melting as well as incineration of medicines as well as harmful substances


Needs and specs for the practice of supply, installation, performance and ensure the 3 incinerators for burning and incineration of medications as well as also harmful substances for customizeds branch

Free 3 years warranty for incinerators from dispatch day. Additionally of free of charge additional components ensure letter must stand for a single decade from conclusion day of assurance.

4-copmany needs to dedicated shipping, procedure, and likewise installation within 60 days from the date of site tasks detection.
Offered time asap
The company should make all the maintenance work also adjustment of their control and security devices as well as also filterings system/ filters cleanse insulation.{
(adsbygoogle = window.adsbygoogle || []).push({});|}{
(adsbygoogle = window.adsbygoogle || []).push({});|}
1. Educating for experts as well as also vehicle drivers to get a period very little less than two days at each web site and supply trainees educating certificates.
Business payment (accredited from Chamber of Business).
2- Technical justification for solution technicians heating and training unit drivers.
Indicators for heating systems in addition to index overload.
In situation of order, we require two certifications of starting that must be stamped from Saudi consular workplace in your country|
2- Letter from the supplier to provide 3 years service warranty for incinerators from shipping day. In addition of complimentary extra components ensure letter ought to endure for a single decade by the end day of assurance.
3- Offer certification that the incinerators are environmentally friendly as well as also attach evidence that environmental administration company in the nation of Origin as well as likewise your merchandise needs to be discharges cost-free as a result of the degree of degree of significance of its global air vents.
Alarm system Sensor at the event of (accidents “heater” or filtration gadget or heat leakage or interior connections as well as electric wiring).
– Isolation of shedding area: the area in between the wall surfaces must be of the “stainless-steel”. – Incinerators have actually to be fitted with a controller board of the electronic methods to keep an eye on all the necessary indicators of activation methods, as well as start-up as well as switch off so as to be divided inside a steel box with the occurrence of these:.
2- Technical justification for solution technicians heating and training unit drivers.
Records need to consist of all the information such as pamphlets, technical resources, operating, maintenance manuals, in addition to handouts taking good care of their key-board.
Location temperature degree sensors.

Needs and specs for the practice of supply, installation, performance and ensure the 3 incinerators for burning and incineration of medications as well as also harmful substances for customizeds branch


Medical Waste Treatment Equipment


Basic Info.

Model NO.:medical waste incinerator manufacturers in china
Export Markets:Global

Product Description

Nanjing Clover Medical Technology Co., Ltd..

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Key Features:  * All versions with Dual combustion room.  * Stainless Steel chimney/stack, long life. *based on sequence * High fever, long life of incinerator.  * Free or minimum installation onsite.  * High speed, from 10kgs to 500kgs per hour, up to 6ton daily.  *based on order  * New Design for pet animal cremation enterprise.  * One year warranty on incinerator and parts in stock.

pet incinerator


The incinerator plant shall incorporate a control panel for its operation. On the control panel we shall have a visual

display of the chamber temperatures. This visual display must control and monitor the incinerator and his performance.

Capacity of destruction in weight shall be 60 Kg/h.

It should be able to operate not less than 10 hours/day

This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories,

institutes, etc…

Design Specification : Types A, B, C, D, and E of medical waste

Supply, installation & testing DUCTED SPLIT UNITS at waste store with sufficient capacity to maintain the internal

temperature at 14 degrees Celsius in summers and winters


Gas Fired Incinerators


Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Application Scope:  1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. 3. Community & Sea Port & Station: Municipal Solid Waste, etc.  4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Waste Incinerators Msw4000


Basic Info.

Model NO.:MSW4000
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

We’re one of the largest waste incinerator producer and exporter of China. Pyrolytic incinerator specialized is primary waste treatment method all around the Earth, environmental incinerator, economical cremation equipment for creatures, economical incinurater, edical incinerator, electric incinerator 100kg, for Medical Waste, Animal Incineration, Pet cremation and other good waste. Presently, we provide small and large scale incinerators as local client requirements and design upgraded incinerator with our leading technology. 

Key Features:  * All version with Dual combustion chamber.  * High temperature, long life of incinerator.  * Free or minimal installation onsite.  * High speed, from 10kgs to 500kgs per hourto 6ton per day.  * Remedy for A/B/C/D/E grade medical waste.  * New Design for pet animal cremation business.  * One year warranty on incinerator and components in stock.

Items/Model MSW2000 MSW3000 MSW4000 MSW5500
Burning Rate  150 kgs/Hr. 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr.
Feed Capacity  400 kgs 600 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 9500 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 3000 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270x185x380 280x230x425 320x220x460 360x220x475
Internal Dimensions (cm) 180x115x96 240x120x105 257x147x108 300x147x125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chmaber Temperature 1000degree-1200degree 1000degree-1200degree 1000degree-1200degree 1000degree-1200degree