Burner YD-500 for Vietnam



We finish this project in year 2010 to 2011 and also distribution to Hochiminh port, Vietnam with 1×× 40′ feet open leading full container.

Items/Model YD-500
Burning Rate (kgs/Hour) 500 kgs/Hr.
Feed Capacity (kgs) 800 kgs
Equipment Weight 13000 kgs
Primary Chamber (Liters) 4000
Secondary Chamber (Liters) 1500
External Dimensions (cm) 320x220x460
Internal Dimensions (cm) 257x147x108
Oil Tank(Liters) 500
Door Opening (cm) 108 x 128
Chimney (M) 14
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.



Waste Administration Preparation


If burning and also incineration is utilized, the gadgets selected necessity to be made in addition to sized to match the waste produced, reduce fire danger in addition to likewise result in the total burning of their waste.

Reuse waste where various functions could be determined.

In spite of having much better waste reduction measures in place there’ll surely be waste developed. Waste by its character is typically a mix of varied unwanted products. The trailer and recreation of numerous type of waste is an effective means to lower the amount of waste requiring expensive handling, storage space, treatment in addition to also disposal. Dividing also makes it feasible for the reuse of specific kinds of waste for a different function. Reuse activities might be undertaken either off-site or on-site.

Treatment and disposal is the last action in efficient waste management and likewise must be handled only besides several other practical reduction in addition to also reuse choices have been checked out. A large selection of treatment and disposal choices exist in addition to also each have to be checked out before deciding upon a last approach, no matter whether waste is to be taken care of as well as cared for on-site or off-site. If trimming and incineration is the approach of choice, devices has to be produced along with sized accordingly to match the kind in addition to quantity of waste being produced. As defined in the adhering to area, open burning can securely messing up a minimum number of kinds of waste. While burners are capable of safely damaging a broader series of waste, countless type of waste should nevertheless be diverted. On-site partition stays an important element of any type of waste tracking plan due to the fact the this.

Typically, the adhering to concepts have to be used to direct liable good waste monitoring prep:

Know your waste by doing a waste audit.|


BURNER DIESEL FIRED



Heater 20 Kg
Burner electrically ran
containing:
A cage for receipt of biomedical waste;
A burning chamber with fireplace with a filter to preserve ashes;
A cover;
An air supply;
A wind generator allowing supply air.
Burning temperature: 1800 ° C.
Consists of all gadgets. ▪ The burner ought to be a modern-day garbage disposal system, made
to bum medical waste in a neat in addition to eco effective
fashion. It needs to use a temperature based reasoning control system
To supply ideal control of the operating problems and
incorporate a high ability thermal oxidizing extra chamber.
It needs to be made to keep the exhaust gases, for a minimum of 2
secs to make sure the device’s dependable damage of the combustion
items.
▪ All the burners to be supplied as well as established fulfill the
Waste Keeping Track Of Standard 2006, authorized notice No. 121 of
29th September 2006 as well as specifically third schedule legislation
( 26, 47) connecting classification, standards, standards, in addition to
procedure for establishing as well as running incinerators.
▪ The capability of the burner called for must be to the
specifications with a capacity to thaw 100kgs/Hr.
▪ The burner will be operated a three-phase power supply
( keys).
▪ For the technological exam, not just the treatment plant
the whole system will certainly be taken into consideration. It will be the responsibility
of the Bidder to give a complete system, consisting of all eventually
moreover essential extra systems and also additional
devices.
▪ The system supplied will be established to run normally under
the conditions of the buyer’s nation. The conditions include
Power Supply, Environment, Temperature Degree, Wetness, and so on
▪ The Potential customer needs to supply a warranty for one year.
▪ All message, spec etc. on all control running user interfaces as
well as on info displays in addition to on print-outs will certainly remain in
English language.
▪ The Potential buyer supervises of all consents as well as also approvals for
importation. The Prospective purchaser will offer all the vital
paperwork in order to aid with the authorized demands for the
installation as well as likewise putting into usage the tools.

▪ Duration of Implementation is 90 days from agreement trademark for
delivery to website along with completion of all confirmation procedures
needed for the issuance of provisionary approval.
▪ Representatives of the Obtaining Authority and also the
Recipient, together with the Prospective customer’s representative, will
carry out the controls, testing and likewise initial authorization for provisional
as well as also last authorization. The provisionary and last approval shall
occur at the last location.
▪ Customer care: The Prospective buyer is called for to guarantee that a.
upkeep, solution and also dealing with centre, which is recognized by.
the Manufacturer, as well as which has the ability to swiftly offer genuine.
additional components and also consumables recommended by the Distributor.
is supplied throughout the one year solution warranty duration. In.
fulfillment of this demand with their offer, possible purchasers must.
send a declaration authorized by the producer or agent.
of the manufacturer:.
ͦ Providing the name along with address of its qualified.
upkeep, solution in addition to repair centre,.
ͦ Verifying that this recognized maintenance, service and additionally.
repair work centre has the ability to swiftly provide authentic extra components along with.
the consumables suggested by the Manufacturer; and.
▪ The Prospective buyer will be liable to offer as well as additionally install all.
devices supplied to the healthcare facilities in the.
Republic of Kenya. The Bidder will supply a time routine over.
the total structure as well as creating duration. The delivery.
and additionally setup time have to be agreed between prospective buyers, target.
Clinical center and additionally the Getting Authority. The treatment plant must.
show up pre-assembled. The Possible customer shall ensure that all parts of.
the plant moved by sea shall not be supplied as “deck.
cargo”.
▪ It is prepared for that the Potential purchaser cooperates really carefully with the.
service provider for the new waste managing framework/ property and also will.
make available all required technical information, attracting, and so forth to.
the professional.
▪ The Prospective buyer will provide as well as also mount the incinerator with the.
adhering to connected specifications

For the Supply, configuration & & & & appointing of a Professional Waste Burner as comprehensive listed here:.
i. Waste kind Healthcare waste.
ii. Waste thickness 125 to 350Kg/M3.
iii. Waste Calorific Value 4000 KCAL/Kg.
iv. Dampness internet material 10-25%.
v. Approximated ash residue 5-10%.
vi. Little capability 100Kg/hour established loads.
vii. 2nd chamber 2 seconds @ 1100 ° C. viii. Environmental Administration Coordination Act, 1999 and also specifically, Waste checking standards, 2006.
2 Devices.
2.1 Secret Combustion Chamber.
▪ The crucial combustion chamber is the significant framework of the.
heater, made from light steel plate and also tensed with.
rolled steel areas. It is brought from the flooring level on a.
considerable steel help framework. Internally the covering is lined with.
calcium silicate insulation and likewise a warm face combination of very.
obligation brickwork or high durability castable.
▪ The primary burning chamber require to guarantee minimum separation.
temperature degree is not less than 850 ° C
. One Guidebook Lots Burner making up:.
▪ Handbook Loading door (sturdy steel door with suitable.
refractory lining).
▪ Horizontal strong hearth, refractory lined vital burning.
chamber. Approximate dimensions 800 mm sizes x 2100mm.
long.
▪ Complete sized mass load/ash elimination door.
▪ 1 off diesel-fired ignition heater– – temperature managed.
▪ 1 off melting air supply follower and likewise blood circulation system, automated.
control.
▪ High capacity second combustion chamber with house time.
not much less than 2 secs @ >> 1100 ° C. ▪ 1 off diesel-fired afterburner– – temperature level managed.
▪ Control panel– – automated operation.
▪ Temperature level indication primary as well as additionally additional chambers 0-.
1200 ° C. Both chambers need to be shielded with refractory.
material (extremely commitment 100mm thick firebrick with 25mm thick.
calcium silicate insulation).
Remember: The second burning chamber have to make sure that the gas temperature as established versus the within wall surface in the second chamber & & & & not in the fire location, is not much less than 1100 ° C. 2.2 Throughput.
100kg/hour at a little calorific worth of 4,000 kcal/kg and also a common bulk density of I20kg/ M3 for fundamental waste along with l60kg/ M3 for healthcare waste.
2.3 Ash.
The waste will be reduced by 90 ~ 95% to leave 10 -5% ash.
2.4 Quality/Environmental Needs.
▪ Setup Monitoring and also Sychronisation Act, 1999.
▪ BS3316.
2.5 Running Duration.
▪ Anticipated day-to-day operating duration 8 hrs.
▪ Maximum running period 12 humans resources.
2.6 Chamber.
▪ Should be refractory lined to the adhering to requirement; Hearth in addition to.
reduced area of chamber walls.
2.7 Warm face product.
▪ Super responsibility firebrick.
▪ Limiting constant option constraint 1500 ° C. ▪ Thickness 100mm.
▪ Thermal conductivity 1.3 W/mk.
2.8 Insulation.
▪ Calcium silicate.
▪ Limiting constant service constraint 1000 ° C.
▪ Thickness 25mm.
▪ Thermal conductivity 0.095 W/mk.
2.9 Smokeshaft/ Lot.
▪ Need to be manufactured from refractory lined light steel or high.
top-notch air-cooled stainless steel. The chimney/stack needs to have a.
minimum elevation of 10 meters over ground degree.
▪ Refractory lined flanged smokeshaft should more than the elevation of.
any type of kind of existing roofing adjacent to the incinerator.
▪ Give training equipment to lift, put up as well as likewise position smokeshaft, along with.
offer sustains slings as essential. Enable cutting of tree.
branches to assist in the workout.
▪ The smokeshaft will be painted with accepted warmth immune.
paint after arrangement.
2.10 Ignition Burners.
Totally packaged oil kind, total amount with electric ignition as well as additionally flame failure controls, wired with continuous running fan as well as likewise complete with all shutoffs, fan as well as additionally electrical motor.
· Optimum rating: a minimum of 450kW/hour.
· Heater: set up on/off procedure.
· Optimum usage: a minimum of 6 litres/hour.
· Ordinary consumption: at least 3 litres/hour.
2.11 Afterburner.
Fully packaged oil kind, total with electrical ignition along with flame failure regulates wired with consistent running fan and also total with all shutoffs, fan as well as also electrical motor.
Maximum ranking: at the very least 450kW/hour.
Burner: set up on/off operation.
Maximum use: at the very least 9 litres/hour.
Average intake: at the minimum 4.5 litres/hour.
2.12 Flue gas therapy.
▪ Demands to have particulate cleanser (scrubbers). A mechanical.
fragment collection agency ought to be incorporated after 2nd.
shedding chamber for removal of bit pollutants.
entrained in the flue gas stream.
2.13 Diesel Storage tank.
▪ To supply diesel services storage tank (Capability 400 litres).
including degree indication.
▪ The container need to be connected to the burner at greater level.
to make it possible for free-flow of diesel from the tank to the incinerator.
The connecting pipe needs to be a black pipeline of approved scale.
as well as size. Consist of various other going along with gadgets and.
fittings.
▪ Attach heaters to fuel supply.
2.14 Electrical Supply.
▪ 3 stage 415 V a.c., 50/60 Hz.
3 Papers:.
Procedure handbook 2 collections.
Service/maintenance guidebook 2 collections.
4 Certification.
▪ National Atmosphere Keeping An Eye On Authority (NEMA).
certification.
5 Capability to service devices.
▪ The agent/supplier will have adequate facilities, spare elements,.
consumables and also certified as well as also experienced technical personnel.
Configuration jobs.
▪ Provide elevating gears as forklift, gantry, rollers, and also training.
jacks and additionally establishing heater.
6 Selecting along with Training.
▪ The Rep will examine prepared operating specifications

▪ The representative shall carry out a 2 days operation & & & & maintenance. training to the Biomedical engineering staff members along with heater.
operators after configuration & & & & appointing of the devices.
7 Commissioning Maintenance Agreement.
▪ Prior to the expiration of the service guarantee/ signing off, the distributor shall.
supply a 1 year alternative option parts (e.g. oil filters, air.
filters), the Quarterly normal upkeep price per quarter.
for 3 (3) quarters.

Maintenance control recommendation.
▪ The maintenance agreement cost consists of work, transport and also.
lodging for the participating in service technicians.



Pet Cremation Equipment


Product Description

PLC( Programmable Logic Controller), Intelligent and Automated operation.

Double combustion chamber, Residency time 2.0 sec. In secondary combustion chamber. Virtually smoke and odor free. 

Smoke Filter Chamber with filter brick, Virtually smoke and odor free after burningoff.

Italy first oil or gas burner, quality reliable. It suit for diesel oil, natural gas, LPG gas. 

Items/Model TS50(PLC)
Picture  
Burn Rate 50 kg/hour
Feed Capacity 100kg
Control Mode PLC
Combustion Chamber 560L
Internal Dimensions 100x80x70cm
Secondary Chamber 280L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.7Kw
Oil Consumption (kg/hour) 12.1–24
Gas Consumption (m3/hour) 9.9–26.1
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 70x55cm
Chimney 5Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800degree–1000degree
2nd. Chamber Temperature 1000degree-1200degree
Residency Time 2.0 Sec.
Gross Weight 4500kg
External Dimensions 230x130x155cm

User guider, complete installation and performance document for customer.

Biomedical Waste Incinerator, 10-15 KG 

Biomedical Waste Incinerator, 10-15 kg

Incinerator Introduction
Manufacturer:
Brand:
Type / Model:
Country of Origin:
Description of Function
The Biomedical Waste Incinerator is used for Incineration of each type of Biomedical Waste.
The Disposal of such Biomedical waste is a very important as it is a dangerous wastes for
human life, and It is only possible with a perfect incinerator.
Operational Requirements
It shall be operated by manual and automated mode.
The combustion efficiency (CE) shall be at least 99.00%.
The combustion efficiency is computed as follows:
C.E.= __%CO2______ x 100
%CO2 + %CO
Emission Standards: Lower emission rates are preferred.
Parameters                   Concentration in mg/Nm3 (12% CO2 correction
Max total dust              30mg/m3
Max Sulphur Dioxide      200mg/m3
Max Nitrogen dioxide    400mg/m3
Max Carbon                     100mg/m3
Monoxide
Minimum stack height shall be 30 metres above ground.
Volatile organic compounds in ash shall not be more than 0.01%.
System Configuration
Biomedical Waste Incinerator, complete unit.
Technical Specifications
Incinerator:
It shall be Electrical or Diesel Fired Incinerator or Controlled Air & pyrolytic.
Type of Waste: Biomedical Waste
It shall have burning capacity 10-15 kg/hr.
Fuel: Diesel
Burner: Monoblock fully automatic burners.
Temperature: Primary Chamber 800 ± 50 oC, Secondary Chamber 1050 ± 50 oC.
Type of Waste: Biomedical waste with moisture content up to 85%.
Destruction Efficiency: 99%.
It shall have separate digital display of temperature for both chambers.
It shall have provision for measuring primary & secondary chamber temperatures using external
thermo coupler.
Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.
Primary Chamber:
Type: Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC
Insulation thickness: approx.115mm thick
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Ash Removal: Manual/automatic
Secondary Chamber:
Type : Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC.
Insulation thickness: approx.115mm
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Emergency Stack:
Type: cylindrical, top mounted on venturi ejector.
Material of Construction: Mild Steel, 3mm thick.
Refractory: 75mm thick castable.
Insulation: 25mm thick castable.
Quencher:
Material of construction of outer body: Mild Steel refractory lined from inside.
Shall have water circulation system with centrifugal pump.
It shall have to reduce flue gas temperature before venturi scrubber.
Shall provide pump motor of suitable capacity.
Air Pollution Control Device – Venturi Scrubber
Type: High pressure jet type.
MOC: Stainless steel – 316L.
Temperature at the outlet: 78-80 oC
Scrubbing Media: Water with 5% caustic
Re- Circulation Pump for Venturi Scrubber
Type: Centrifugal
Application: PP/SS
Piping : PPR
Droplet Separator & Re-Circulation Tank (Integral)
Type: Cyclonic
Application: To separate water droplets from flue gases
Material of Construction: Mild Steel Rubber lined 3mm thick
I.D. Fan:
Type: High pressure centrifugal
Material of Construction: Stainless steel 304, impeller and mild steel rubber lined casting
Drive: Bel
Combustion Fan:
Type: Centrifugal
Modulation: Manual damper control
Material of Construction: Mild Steel
Drive: Direct drive
Burners:
No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)
Type: Monoblock fully automatic
Fuel: Diesel
Fuel Oil Storage Tank:
Shall provide suitable capacity of oil storage tank.
Material of Construction: Mild steel.
Facility for visual checking of fuel shall be there.
It shall have diesel consumption monitoring system.
It shall come with diesel oil level indicator, piping with valves & N.R. valve.
Control Panel:
Type: Manual & Automated PLC based control panel with printer & recording device.
Material of Construction: CRCA sheet
It shall have digital temperature controller.
Epoxy powder coated washable paint finish.
It shall have audio-visual alarm system.
Chimney of 30 meters Height:
Material of Construction: Mild Steel
It shall be self-supporting type.
Height shall be 30 meters from ground level.
Paint The chimney is painted externally with two coats of heat resistant aluminum paint
Shall provide ladder till the top.
It shall have 3mm thick rubber lining from inside for protection.
It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, sampling
port.
Consumption certificate:
The bidder must submit diesel consumption for a daily operation of 6 hours.
Turnkey:
Prices offered shall be inclusive of all civil works, electrical requirements including cabling and
switches required for installation & commissioning of the equipment.
Bidder shall submit detail drawings, design, and layout plan of civil works.
The bidder shall submit the details of BOQ of civil and electrical works.
Accessories, spares and consumables
All standard accessories, consumables and parts required to operate the equipment, including
all standard tools and cleaning and lubrication materials, to be included in the offer. Bidders
must specify the quantity of every item included in their offer (including items not specified
above).
Operating Environment
The system offered shall be designed to store and to operate normally under the conditions of
the purchaser’s country. The conditions include Power Supply, Climate, Temperature,
Humidity, etc.
Power supply: 220-240 VAC, 50Hz single phase/400 – 420 VAC, 50Hz three phase as
appropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.
Standards and Safety Requirements
It shall have approval of “Pollution Control Board” of purchaser’s country.
All mandatory approvals required for the installation and operation of incinerator shall be done
by the bidder.
Must submit ISO 9001 AND
CE or USFDA approved product certificate.
User Training
Must provide user training (including how to use and maintain the equipment).
Warranty
Comprehensive warranty for 2 years after acceptance.
Maintenance Service during Warranty Period
During the warranty period supplier must ensure preventive maintenance along with
corrective/breakdown maintenance whenever required.
Installation and Commissioning
The bidder must arrange for the equipment to be installed and commissioned by certified or
qualified personnel; any prerequisites for installation to be communicated to the purchaser in
advance, in detail.
Documentation
User (Operating) manual in English.
Service (Technical / Maintenance) manual in English
List of important spare parts and accessories with their part number and costing.
Certificate of calibration and inspection from factory.

an incinerator for our dental clinics



a burner for our oral clinics.The burner need to follow” Technical Standard NTON 05-015-02 Monitoring as well as Solid Waste Disposal Hazardous carbon monoxide go “, in addition to meeting worldwide requirements capability requirements for new fixed resources and discharges from the Epa United States (Epa EPA) Incinerators Medical and also Medical facility contagious waste (HMIWI its phrase in English) and also the standards of the Globe Health And Wellness Organization (THAT ).

According to direct 8.5.1.3 of the NTON 05-015-02 incinerator have to have the following:

” Incinerators outfitted with a cam primary and a secondary combustion, equipped with heaters capable of achieving full burning of waste and prevalent devastation of harmful and hazardous chemicals (dioxins and furans among others), affixed to the strong waste bioinfectious.

a) primary combustion chamber, it requires a temperature of 800 ° C as well as one hr dwell to be damaged waste produced ash as well as gas, consisting of dioxins can create cancer is discovered.

b) In the secondary combustion chamber should get to temperature levels around 1,100 º C and also have to be operated with a residence time of the flue gases of a minimum of 2 secs. To deal with gas circulation as well as entrained particles, before being launched into the atmosphere, ought to be added towers chemical washing, cyclones, filters.”

The incinerator mounted must adhere to the layout to make sure the destruction of all hazardous, biological, industrial waste and others. Combustion” PYROLYTIC” permits control of the gasification of waste and also stay clear of substantial release of black smoke as well as fine powder throughout loading. It likewise allows, complete as well as routine combustion of the waste.

The primary advantages are a controlled combustion that assures the absence of smoke, dirt, shade or smell. It is also automated, so you do not require guidance and has a low gas usage.

The incinerator consists of:

1. A combustion chamber:
a. water tight door for hands-on loading of waste.
A heater start is limited to swelling of waste.

2.
a. heater combustion, low power.
b. A shot gadget air for total re- combustion of the gases.

c. An input gadget cooling air of the combustion gases.

3.

The burner fulfills as indicated on waste incineration.
They will not burn plastics, packaging other than that the quantity so little that gases require not obtain any kind of therapy, second burning chamber to 1100C deals with every little thing.

The smokeshaft is 350 mm inner size as well as an elevation of 8.13 m will certainly with hatch evaluation.

Combustion chamber

– The burning chamber is thick steel plate (3 to 10 mm) with reinforcements, specially constructed.
– Front loading with water tight door installed on joints, locking screw wheel, adaptable gasket as well as a shielding refractory lined.
– An interior cellular lining of refractory concrete consisting of 42% of H ² 03 (alumina) as well as 100 mm thick wall surfaces.
– fibrous insulation panels made of calcium silicate with a thickness of 75mm.
– Automatic Burner (diesel or gas must be specified in the order) with flames diving in one piece monoblock with a digital ignition system, long-term ventilation control shutoff and seclusion valve.

– burning floor made in carborundum, stopping binding of glass and slag.

Afterburner gases

– The afterburner is strong sheet steel flange link.
– Interior filling up refractory concrete with really high alumina material (65 % H ² 03) as well as a thickness of 150 mm.
– thermal insulation panels made of coarse silicates and calcium with a thickness of 85 mm.
– diesel or gas burner (must be specified in the order ), monobloc straight fire, electronic ignition, risk-free, permanent air flow, control valve as well as seclusion valve.
– air injection nozzles made of refractory steel with a circulation control shutoff.
– These nozzles are particularly designed as well as patented by ATI to guarantee really low hydrocarbon discharges.
– A secondary air injection is set up and also ensures ideal oxygen web content.
– Fan distribution secondary as well as primary air, the air flow regulation is effected through shutoffs and also actuators on automated cycle commands.

Control as well as law
Control board dustproof, painted sheet with baked paint making up:
– A circuit breaker button for each electric motor (followers as well as heaters).
– A timer flexible dead time for every heater control.
– A regulatory authority with an electronic screen for the combustion temperature level.
– A controller with electronic display screen for temperature afterburner.
– The electric panel meets existing standard. For elimination of ash, a squeegee steel frying pan with deals with

Paint
– Shade: Light + dark blue.
– Unique heat.

OPERATION

The operation thereof is as follows:

– Charging waste.
– Shut the door.
– Getting the combustion cycle throughout which no surveillance solution (duration 2 hrs) is called for.

The burning cycle automatically guarantees:
– Starting the secondary air follower.

After 10 mins, the afterburner is temperature:

– Switching on the automatic heater combustion chamber, which assures the result of the gasification of waste. The operating time of the burner is programmable according to the kind of waste, utilizing an adjustable mechanical timer from 1-60 minutes.
– Automatic start of combustion air follower.

After 2 hrs, the end of” burning cycle” instantly guarantee:

– The closure of key air servomotor.
– The post-combustion heater off.

During charging, opening the door instantly makes sure immediate shutdown follower additional as well as key air. At the end of the combustion cycle the follower primary/ second air and burner remains to run for 2 hours to safeguard the burners and to cool the stove. After this time the program instantly shuts off the installment totally.

GAS USE

This installment shall consider operation of diesel with the complying with qualities:

Thickness at 15 ° C (max/ min) 0.88/ 0.82 kg/ l.
Weight sulfur 0.2 % max.
Kinematic thickness at 40 ° c (min/ max) 2/ 4.5 mm2/ s.
Point above 55C swelling.
Cold filter connecting factor -10 ° C max.

DIESEL AND FOOD TANK BURNER

The gas storage tank will lie linked to the dugout roof covering incinerator in a bund as well as have the following characteristics:

– Ability: 1,200 litres.
– Constructed from sheet steel for simple wall surface installment cubeto.
– Outcome for ventilation diameter 1 1/2 “.
– Pressure gauge and also filler cap.
– Meter and level switch

The incinerator has an usage of 16.2 liters of diesel hr to shed waste produced operation 10 hours a week anticipated in 2 burning, so that autonomy will certainly be 7.5 weeks. The tank will certainly have an electrical outlet as well as an inlet for return. Pipelines for oil will certainly drive the black steel pipeline with longitudinal electric resistance welded 3/4″ DN 20mm size. In the tank outlet pipeline retainer particles filter, with light weight aluminum body is positioned, light weight aluminum cup and also stainless steel filter with openings 100 microns in diameter.advise on the intake rates, is that for both chambers, or per chamber?



HICLOVER INCINERATORS



Medical waste is posturing a growing problem all over the world, jeopardizing the wellness of staff, individuals, disposal employees and anybody else entering contact with the often dangerous materials discarded by hospitals and other health care sites. Hospital waste varies from website to site and also the most significant difficulty is to dispose of this variety of waste streams. Incineration is still the favored way to process medical waste without threatening the health clients, staff or any individual else coming into contact with them. Professional waste is costing an increasing number of to take care of securely. Health Clinics and also University hospital can currently handle their very own waste streams using among our expert clinical incinerators. Ruining contaminated materials at source is without a doubt the most efficient as well as efficient method of taking care of waste that could possibly spread viruses or conditions.

Average 20% -25% of the complete waste produced by healthcare facilities is considered as harmful and may develop a variety of health and ecological threats otherwise handled and also destroyed in a proper fashion.

With years worth of experience in this field, our medical variety of burners are designed to provide for the affordable requirements of small clinics to the more requiring and specialized requirements of big hospitals in their waste administration processes.

HICLOVER is now providing a complete series of medical waste burners, made to give efficient waste destruction, using finest readily available technologies and also environmentally friendly process. As a result of the secondary chamber with its 2 second retention period, our clinical burner range is well matched to process clinical waste.

Our products ensure effective, tidy as well as problem-free disposal of medical waste is possible. The incineration of professional waste including pathological waste (red bag waste), Biohazards & & Sharps, General Medical Waste, from Health Centers, Proving Ground, Drug Firms, Drug Produces, Medical Care Trusts, Plastic Surgery Centers, Nursing Houses, Treatment Houses and also various other Scientific Waste.

○ Middle-Small Ability( TS Model)

※ Main Qualities:

— — Double Burning Chamber

— Dual Italy Heater

–– Burning Price: 10-100kgs per hr

–– Combustion Chamber: 0.1M3-1.2 M3

※ Optional Function/Parts/Material/ Burning Price:

— — Stainless-steel Smokeshaft

— Dry Smoke Filter Chamber

— — Chimney Height Customized Made

— Upgrade/Downgrade Burning Rate

○ Large-Middle Capacity( YD Version)

※ Highlight:

–– 3 Combustion Chambers

— — Dual Italy Heater

–– Burning Price: 30-600kgs per hour

–– Combustion Chamber: 0.36M3-5.5 M3

※ Optional Function/Parts/Material/ Burning Price:

— — Stainless Steel Chimney

— — Dry Smoke Filter Chamber

— — Smokeshaft Height Custom Made

— — Semi-Automatic Waste Feeding

— — 3-Section Damp Scrubber System

— — Movable System Feeding Door

— — Added Heater

— — Upgrade/Downgrade Burning Price

 



N95 Face Mask Machine Production Line on Sale Now!$250,000USD per set


N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set

N95 Face Mask Machine Production Line on Sale Now!

Twitter ID: @hiclovercom
Website2: www.clover-incinerator.com
(adsbygoogle = window.adsbygoogle || []).push({});
Email1: [email protected]
Website1: www.hiclover.com
Wechat: 008613813931455

Clicky

l Dimension(L*W*H): 1037*855*1780

HICLOVER – Medical Environmental 

l Power Supply 15.3kw mono stage

l Net Weight: approx.: 1500kg


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator