incineration in china


Combustion Efficiency     99.99%

Retention time    Of the flow gases not less than 2 Sec in the hot portion.

Excess Oxygen concentration  Of primary combustion chamber 3-6% max.

Refractory    The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and

with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the

secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than

70 C.

Doors    Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent

any gas escaping, and the doors should be kept under negative pressure during the operation.

Air Emission Control System  With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.

Wet System  If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from

suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to

use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance

with KEPARS.

Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the

wet scrubber system including sensors.

Chimney       It should be suitable with the capacity and the technical specifications, with height not less than 12m from

ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D

downstream direction and 2D upstream from any flow disturbancies.

Sampling point    Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and

equiped with suitable stairs from ground to the port with comfortable slope.

Ash Removal      It should be auto ash removal system.

Fuel       It should be dual system, such as diesel and natural gas.

Feeding System  Should be auto feeding system into primary chamber.

Control Room     Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital

Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also

Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous

monitoring system reading and print out of gas emission parameters…etc.

Cooling System   The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling

if the Temp. will be heigher than 1100 C.

Inter-lock system       The incinerator should be equiped with inter-lock system to prevent feeding the waste to the

primary chamber if the combustion Temp. less than 500 C.

Flue treatment and cleaning     To consist a combined system (wet/dry), using water, lime, active carbon and ceramic

filters.

Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as

stainless steel 316 or equivalent.

Noise Level  Not more than 85 dBA during normal operation.

Inaddition    The desigh should insure that responsive fail-safe control systems are used.

The incinerator should be installed inside closed suitable building with good aeration and ventilation system.

The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and

waste containers, and cool storage area…etc.

The quotation should included list of original spare parts for 7 years.

The quotation should include supervising, starting up and training of the operators and ministry of health

engineers inside/outside Kuwait.

Detailed drawings, catalogs should be included.Our normal activities generates  2-5 tons of assorted waste

materials per day which range from condemned carcasses, and other wastes all which need to be incinerated  at above

800Centigrade measured  flue exhaust gas.


NPA and Vision talk trash over garbage incinerator

The NPA held a press conference on Oct. 2, 2014, to advocate against the building of a new garbage incinerator.

Non-Partisan Association mayoral candidate Kirk LaPointe is trash talking political rival Vision Vancouver for apparently doing nothing to stop the building of a new garbage incinerator in Metro Vancouver.

“[Mayor Gregor Robertson’s] plan to build an incinerator without community consultation, without transparency and without actual proven technology is an attack on Vancouver,” LaPointe said at a news conference Thursday.

But the fact is the mayor and Vision Vancouver are staunchly opposed to an incinerator and have made that position very clear to Metro Vancouver, the organization that will decide sometime in 2015 how and where to deal with the region’s garbage.

“We are completely opposed to incineration… it’s great that [the NPA] now also seems to share that position,” Coun. Andrea Reimer said Thursday, adding it’s “frustrating” that the NPA hasn’t come out with any new policies.

Council voted in 2013 to consider using a piece of property at the foot of Main Street and Kent Avenue South for a waste centre, but only if it meets strict environmental and health criteria.

The city’s website states it “does not support garbage incineration facilities, and would not allow the burning of garbage at the proposed facility under any circumstances.”

One of the technologies the city said it would consider is gasification, which has fewer emissions and converts waste to synthetic natural gas.

But LaPointe is also strongly opposed to gasification in city limits, saying it is an unproven technology that poses environmental and health concerns.

Instead, LaPointe supports unspecified landfill options, recycling options and sorting technologies.

Regardless, Metro Vancouver has not yet chosen where to put a waste plant.

“The NPA believes strongly in fighting to keep our air clean and our citizens healthy, but Vancouver’s waste-to-energy plans are likely to generate more emissions and harmful chemicals into the atmosphere,” LaPointe says. “An incinerator or gasification plant is simply not a green option. There are significant health and environmental challenges with both options.”
He says Gregor Robertson and Vision Vancouver, the supposed defenders of all things “green,” are doing nothing to stop the building of a costly new garbage incinerator in Metro Vancouver and are proposing their own “gasification” plant at Main St and Kent Ave. “They have failed to defend the interests of Vancouverites.”

LaPointe says he and an NPA government will fight the plans no matter where the incinerator might be built, and instead concentrate on ways to increase reducing, reusing and recycling the City’s solid waste.
“The only thing less green than burning or “gasifying” garbage in Vancouver is using fossil fuels to ship it elsewhere for burning. We share our air with the region’s other municipalities.”

LaPointe says fiscal concerns accompany the health and emissions worries. “The construction of a new incinerator represents significant risks for taxpayers,” he says, noting its cost of construction has increased by almost $50 million to the current $517 million estimate. “Vision Vancouver’s failure to address the cost issue again demonstrates its failure to manage the City financially.”

The Burnaby waste-to-energy incinerator, which loses money annually, is expected to lose another $16 million in this year.

LaPointe says Metro Vancouver has publicly identified three potential sites for a solid waste incinerator, while six additional, secret sites are under consideration. The City of Vancouver has also proposed a gasification facility in South Vancouver and that has residents concerned.

Jay Jagpal, NPA Park Board candidate and South Vancouver resident, says: “My community is very concerned about the lack of transparency around this project, with its potential to have an impact on so many people. This is typical behaviour of Vision and Vancouverites deserve better.”

Metro Vancouver’s proposed Bylaw 280, a plan to raise costs on waste disposal, is a key step in subsidizing these plants. An NPA government would work to prevent the bylaw from coming into force.

Incinerator for Pharmacuticals Comapny


Product Description

Incinerator is a incineration equipment, direct fire squander by gas fuel or oi gas. As distinct circumscription, incinerator can be termed many words as below: 

Treatment capacity: Small scale incinerator, big scale incinerator and incineration pant.  All over the planet, in most nations, people anti incinerator because the incinerator will create a large Dioxin from the smoke. “Dioxins” refers to a group of poisonous chemical compounds that share certain chemical structures and biological features. Dioxins can be released to the environment through woods fires, backyard burning of garbage, particular industrial activities, and residue from past commercial burning of waste. Dioxins break down very slowly and previous releases of dioxins from both natural and man-made sources still exist from the environment. Anyhow, we have to remind this, that is big scale incineration pant, normally more than 30 ton per day. This is a social problem, clover incineraters, clover medical China, clover medical net, clover-medical, clovermedical. Net, structure of an incinerator, cost for incineration for pets cost of running 100kg,  Cremation equipment cost animal, to examine and suggest ways in various angles in the general public, government, economic growth, environmental protection, technology advancement, etc..

Therefore, why people still use incinerator?  First, for your medical waste in the hospital, the pyrolytic incinerators is greatest treatment up to now. Pyrolytic technology can kill the virus, pollution management.  Second, for individual body, pet animal, in most nations and regions, we want to cremation them. This is the service in the procedure for society growth, and ceremonies to commemorate the disappearance of life. 

As previously two reason but not only above, we still use incinerators. 

How you can find reasonable incinerator to your regional site?  Incinerator isn’t a cheap equipment, normally the small scale model's cost around $5, 000USD per unit and big scale model's cost more than $50, 000USD per unit. Thus, before purchase one unit incinerator, you need to make clear after items: A, burn what? Incinerator is a incineration equipment, function is fire squander. So what sort of waste you would like to treatment?  B, small or big? This according to the waste output daily or the waste volume per feed time, like animal size.  C, fuel? Incinerator use oil or gas , normally, gas fuel is cheaper than oil and also the smoke cleaner than petroleum gas version. However, some local site don't have gas supply system.  And other technology items, such as electricity (220V, 380V), waste feed doorway kind, incinerator structure, etc..

After you describe these, you can go to find a local or global manufacturers, requesting prices, technical specifications and ultimately purchasing the ideal products.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Burner Maximizing Combustion Performance



More smoke along with various other pollutants are introduced right into the air throughout the ‘‘ start-up’ as ‘well as ‘ amazing’ stages of the shed cycle

than throughout the ‘‘ full thaw phase ‘when heats are preserved. Reduced temperature degree smoldering fires need to be

prevented. Melt just dry feedstock as well as sometimes include added waste to the fire in order to keep high melt

temperature levels up until all waste has really been wrecked. If waste is to be open burned on the ground, taking advantage of deep or steep-walled

‘‘ pits’ have to be stayed clear of as this will certainly stop the necessary harsh mixing of oxygen with the burnable gases.

Preferred running temperature degree ought to be completed as promptly as feasible when running any kind of burning or incineration device. A

quick ‘‘ start-up’ can be achieved by initial openly filling completely dry paper, paperboard product packaging and without treatment wood right into the lower

of the gizmo. Dry, openly packed material will stimulate faster as well as also burn extra evenly than a damp, securely stuffed tons.

Moist waste requirement to simply be included after the fire is proactively burning. Overfilling the burn chamber will absolutely avoid the rainy

blending of burnable gases in addition to oxygen, along with should be protected against.

Modern batch feed incinerators are made with supporting as well as main heaters to accomplish as well as protect the required high

thaw temperature levels. Added waste needs to just be consisted of in these incinerators once the ‘‘ cool off’ phase has actually been

finished along with it is safe to do so.



Animal Carcass Incinerator


Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Key Attributes:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to sequence * High temperature, long life of incinerator.  * Free or minimum installation on site.  * High burn rate, from 10kgs to 500kgs per hour, up to 6ton daily.  *according to order  * New Design for pet animal cremation business.  * One year guarantee on incinerator and components in stock. 

Presently, we provide different collection for local customer requirements and layout updated incinerator with our leading technology. Animal iacinerator, creature incincerator pricing, creature incineration, creature incineration emerging technologu, creature incineration gear in china, creature incineration equipment  Costs, The updated design characteristic of our range of incinerators make them one of the most cost effective in the world.

Items Specification
YD Model YD-30 / YD-50 / YD-100 / YD-150 / YD-200 / YD-300 / YD-500 / YD-600
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Mobile Small Range Medical Waste Incinerator with Cart or Wheel


Mobile Small Scale Medical Waste Incinerator with Trolley(E-Power) or Wheel
Model YD-30 
Picture

 
Burning Rate  average 30 kgs/hour
Feed Capacity average 40 kgs
Paimary Combustion Chamber 200 Liters
Secondary Combustion Chamber 100 Liters
Mix Combustion Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.59Kw
Fuel Type Diesel Oil
Burner Italy Original
Oil Consumption (Diesel Oil) average 13.3 kg/hour
Gas Consumption (Natural Gas) ***
Internal Dimensions 80 x 50 x 50cm (paimary chamber)
External Dimensions 125 x 90 x 180cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 60 Liters
Door Opening 40 x 40cm
Chimney Length 1.0 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 1500/1700 kgs

1 INCINERATOR BURNER 1N 230V, 50/60Hz , 0.32 KW, IP 40, Brand: BALTUR , Made in Italy (Attached Per Name Plate and specification ) Complete Set Set 1 
2 INCINERATOR BURNER 1N 230V, 50/60Hz , 0.15 KW,IP 40, Brand: BALTUR , Made in Italy (Attached Per Name Plate and specification ) Complete Set Set 1 
3 INCINERATOR BURNER , 220V, 50 Hz, 119 KW, CX 10 , Brand: CAREER (Attached Per Name Plate and Photo Specification) Complete Set Set 1 
4 INCINERATOR BURNER, 220V, 50Hz, 172 KW, CX 14, Brand: CAREER (Attached Per Name Plate and Photo Specification) Complete Set Set 1 
5 Controller for incinerator , Model: LOA24.171B2BT, Brand: SIEMENS, 220-240VAC , 50/60 Hz, 3 VA, Made in Germany (Attached Per Photo Specification) Each 1 
6 Controller for incinerator , Model: LMO14.111 C2BT, Brand: SIEMENS, 230VAC, 50/60 Hz, TSA Max: 10s , Made in Germany (Attached Per Photo Specification) Each 1 
7 Temperature Contorl Unit for incinerator, Brand: XMT , Made in CHINA (Attached Per Photo Specification) Each 1 
8 Timer for incinerator (Super Timer Multi -Range Type, Type: ST3P A-F, Input: 200-220 VAC, 50/60 Hz, Contact Rating : AC 200V IND Load, Making : 3A with Base, Made in CHINA (Attached Per Photo Specification) Each 2 
9 Ignition Transformer for incinerator, Type : TC2STCSF, Code : 15910662, Primary : 220-240V, 30VA, 50/60 Hz, Secondary: 2X12KV, 20 mA, AB 100% T60 H , Made in ITALY (Attached Per Photo Specification) 
For medical and animal waste

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-30


a DUCK ranch heater



a DUCK farm burner, we require to acquire a tool size incinerator for organic waste, a lot more specific DUCKS.an animal dog crematorium in ireland.Equipment Double chamber medical infectious waste burner Capacity 10-30 kg per hr Features of waste
The list listed below average features are thought about *:

residence heating well worth above 2000 kcal/kg (8370 kJ/kg); material of combustible matter over 60%; internet material of non flammable solids listed below 5%; product of non-combustible fines detailed below 20%; moisture material listed below 30% by weight

Burning efficiency: The medica waste burner will certainly be capable of minimizing waste to ash not exceeding 10% of the total flammable prices. The scientific waste burner will be installed outdoors. All burner parts will certainly be appropriate for however not restricted to outside shaded arrangement, consisting of electrical electric motors, be resistent to rust, dampness and also relevant climate aspects.

Outside installment. The clinical waste incinerator will be mounted outdoors. All incinerator components will be suitable for however not restricted to outdoor shaded setup, including electrical motors, be resistent to corrosion, wetness and also related climate aspects.

can you please onward me some info. an ideal Burner for Incineration of oil, plastic hazardous waste, sludge waste, harmful filters etc.



laboratory incinerator

the entire carcass of animals ( cattle , horses ,
Sheep, pigs , etc.) , as well as biologically hazardous waste
Products in the fuel stove .
? Opening Doors – the closure and fixation automated system ,
Which are managed remotely by the operator .
? designed to work in long mode and fast
Action ( Quick Start EP – i)
? Fully mobile – mounted on wheeled chassis
Even during the operation . Incinerators must be provided
As standard equipment a special truck

air retention for at least 2 seconds at a temperature of less than 850C, the combustion
In order to achieve the proper effect.
? must be a two-chamber incinerators, primary and secondary
Fuel stoves
? The waste products to reduce the initial volume
Possible to minimize (approximately 5% sterile ash
Form).

Incinerators should be provided in the fuel tank (diesel )
? The minimum capacity of the animal carcass incinerator
The destruction of 1000 kg / hour. Incinerator capacity is calculated
8MJ/kg- material and 60 % humidity.
? It must be possible to use the incinerator +40
C to – 15 0C laboratory incinerator
Temperature and 5% – 95% – of moisture conditions.
? PLC controller and a built-in temperature panelita complete
Automatic control, a control computer, which is stored
Information on the variation of temperature with respect to time and
Graphic images.
? must have fuel with automatic control and malfunction
Detection system.
?the ability to pre- warm-up , body waste burning on and off
Consistency is independent of the first and secondary chambers.
? ensuring the incinerator with electricity , it
Must be installed on the generator.
? clean the incinerator should be simple tools ,
Without using any additional equipment