inciner8ter model TS50 OR TS100 With delevery in Europe stare Croatia.Please can you send me the offer for pet crematory equipment.details of Chemical waste incinerator.
For animals to 90 kg. cremation equipment for pets ( Max. Size dogs till 80 kg )1. technical specification is for burner only
2what is the capacity of burner in one hour?
3. 35 for burners, 8 for control case, 1 for HD is that the weight of each item?
4. are these already configured so that the assembling becomes easy between control case and burners with HD?oil burner, 2sets (bigger capacity)
Temperature Thermocouple, 2 sets
Oil Tank 100Liters, 1 set
Thermal Gasket, 10 Meters
Incinerator control Case, 1 set
Blower, 1 set.an industrial sized incinerator for tobacco and tobacco waste. Details
Brand = Any
Model = Any
400v/50hz
· Types of waste – woods, tree branches, tree leaves, wood powder and card boards
· Daily Hours of operation = 7 hours
· Per day produce waste capacity = 10000kg
THEE SETS OF CATALOGUE ORIGINAL SHOULD BE RECIVED BY DHL + CD VEDIO
THREE YEARS GUARANTEE FREE FREOM DELIVARY DATE AND FREE SPAR PART ALSO, GARANTEE LATTER SPAR PART SHOULD BE VALID FOR 10 YEARS FROM THE DATE OF DELIVEARY .
ELECTRIC UNIT SHOULD BE DELIVERD WITH SERVIC MANUAL IN ENGLISH FOR EACH ONE
ELECTRIC SHOULD BE 380-220 V HZ 60 FOR ALL EQUIPMENTS
DELIVER TIME ASB
OFFER VALIDITY SHOULD BE 6 MONTHS
IN CASE OF ORDER I NEED
TWO SETS OF CERTIFICATE OF ORGINE SHOULD BE STAMPED IT FROM SAUDIA EMBASSY IN YOUR COUNTRY
COMMERCAL INVOICE( LEGALIZED FRO CHAMPER OF COMMERCE)
TWO ORGINAL BILL OF LADIN
should BE SEND SOME ONE FOR FIXE AND TRANING FOR 5 PERSON IN EACH LOCATION
SHOULD BE SEND YOUR DIZIN FOR INSTALATION UNITS
AWITING YOUR GOOD REPLY
De manera atenta solicito me colabore con la cotizacion del incinerador incluyendo envió.Puri team a friendliness organization in Indonesia is interested to introduce renewable energy in Indonesia or to utilize the energy resources for its center around Indonesia. Kindly request to have even more info on burner innovation as it is needed to process 100 heap to 500 load waste aday. In the Structure of our Specialized Projects Monitoring, we are currently in look for distributor of Waste Incineration system for hazardous waste, the incineration system will certainly be utilized for incineration of Prohibited Drugs and toxic materials, waste poultry, Dead Animals “cows, goats”, Spoiled vegetables, Etc. at custom-mades Ports. For that we would like to request for your technological and also Financial Proposal for supply, setup and also Commissioning of Contaminated materials Incineration system with incineration capacity of at the very least 400 Kg/ human resources.
Web Page
– The main body of the burner will be stainless-steel and also the outside insulation density of not less than 7 mm made from zinc or phosphate for temperature insulation
– The major entrance of the Burner ought to be 150 mm thick as well as stamina not less than 170 kg/m3. The door should be automatic with remote to operate.
– The Incinerator ought to be developed in accordance of the environmental law adhered to in nation of origin or based on Saudi Arabian PME Rules.
– The incinerator should have fuel storage space with ability of 1000 litre.
– The burner shall have the capacity to run with temperature level approximately 1300 OC in the main chamber and also it can get rid of the residual while the incinerator functions
– The inside body of the incinerator should have insulation layer made from calcium with thickness of 50 mm while the thickness of the interior surface ought to be 100 mm in order to stand with 1300 OC.
– All the supporting dental braces of the burner shall be mounted on stainless-steel.
– The space between the outside and internal body will be loaded with the unique insulation material.
– The exhaust will not stay more than two (2) secs in the second chamber and also this chamber shall be built with high thickness of ceramic sanctuary.
– There needs to be a stack with 4 (4) meter from the leading surface area of the burner as well as can be eliminated as well as set up.
– The incinerator will have control device for exhaust gases to ensure that the emission shall fulfill the PME resource standards
– The power supply ought to be 220– 380 Volts, 60 Hz. and also the burner shall be provided with control board revealing the following:
Page|5
– Temperature level of second and key chamber.
– Condition of pressure gages.
– Alarm revealing if there is any kind of leakage or misconducting in the power.
– Sign for straining the heater.
– Timer for automatically turning off the incinerator.
– All the burner parts including fuel pumps, followers, pipelines and also shutoffs can be run in high ambient temperature level (50OC).
– All components of the burner will be repainted in one shade which ought to be resistant to high humidity, heat as well as high dust/ sandstorm.
– 3 years warranty with extra components and also technical supply and.
– ten years warranty for offering extra parts starting from the date of initial warranty expiry.
The bidder will give all essential information connected to the facility measurements, room area needed for the whole system as well as all procedure needs, Details concerning required center (wall mount) including Design, civil job and also electromechanical details including electricity, water pipes, fuel pipelines, tanks, and so on. Called for Operation staff, Fuel intake price of the entire system. Considering that our job is a turnkey task including Style, Build & & Operate of central incineration facility covering all the above mentioned information and we have to work with all civil jobs as well as essential needs to run the system.
In the Structure of our Specialized Projects Administration, we are presently in search for distributor of Waste Incineration system for dangerous waste, the incineration system will certainly be used for incineration of Prohibited Drugs as well as hazardous materials, waste fowl, Dead Animals “cows, goats”, Spoiled veggies, AND SO ON at customizeds Ports. For that we would like to demand for your economic and also technical Proposal for supply, setup and Commissioning of Hazardous Waste Incineration system with incineration capacity of at least 400 Kg/ hr. 3
The proposal should include the complete summary of the entire system: Overall expense of supply, Setup, appointing, Automatic feeding, automatic de- ashing during procedure, as well as efficient gas cleansing system (damp, high or dry temperature ceramic filters), constant discharge monitoring system (CEMS), as well as all other accessories, Control panel for all components of the system, Repairing alarm system covering all parts of the system, to alert the operator for the mistake that might develop throughout the procedure, and to do instant corrective action, Emergency Quit button that can quickly shut off/ shut down all significant component of the system in situation of emergency situation., Packing system: side loading, Number of burners: minimal 7 burners, (5 for key chamber, 2 for second chamber), Gas: Diesel, The system must function constantly for at least 12 hrs per day, The key chamber: Heavy- duty anodized Rust resistant steel casing with minimum thickness 7mm.
The bidder will provide all necessary details related to the center measurements, space area required for the entire system and also all operation needs, Information regarding needed facility (wall mount) including Layout, civil work and electromechanical information including power, water pipelines, fuel pipelines, storage tanks, and so on.
The bidder shall provide all necessary details related to the facility dimensions, space area required for the whole system and all operation requirements, Details about required facility (hanger) including Layout, civil work and electromechanical details including electricity, water pipes, fuel pipes, tanks, etc. Complete Drawing & 3D drawing Clearly Show All Sections and Details of the System. List of spare parts and checklist. Required Operation staff, Fuel consumption rate of the whole system. Since our project is a turnkey project including Design, Build & Operate of central incineration facility covering all the above mentioned details and we have to coordinate all civil works and necessary requirements to operate the system.
SECTION V
The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to:
The work specified in the contract will include.
IMPORTANT
To enable the Employer undertake conclusive evaluation of the tender, tenderers are requested to submit with their offers the detailed specifications, drawings and catalogues with Commissioning and maintenance instructions for the Incinerator they intend to Supply, install and commission.
Tenderers who fail to comply with this requirement fully shall have their tender rejected.
3.1 Feeding and Charging
Controlled hygienic mechanical feeding that does not negatively influence the air temperature in the primary and secondary chambers of the incinerator shall be used.
A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:
100 where Win = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.
3.13 | Fuel and Capacity | |
1. | Low sulphur fuel | |
2. | Capacity (Cubic Mtr) | .10 |
3. | Average Capacity | 40kg |
4. | Fuel Consumption (ltrs / hr) | 3 |
1. | Length (mm) 735 | |
2. | Width (mm) 500 | |
3. | Height Incl. Flue (mm) | 1960 |
4. | Door Opening (mm) | 325 x 325 |
1. | Length (mm) | 620 |
2. | Width (mm) | 390 |
3. | Height | 500 |
3. | Burn rate per hour | 5-20kgs |
4. | Temperature Monitoring | Available |
A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:
SCHEDULE 2
NO: | REQUIREMENTS | SUPPLIER’S REMARKS |
1. | Experience
Previous experience in the supply, installation and commissioning of incinerators |
|
2. | 1 Year Maintenance Contract | |
3. | Work rate
at least10kg per day |
|
4. | Design
Basic Plan design to Provide Overall plant layout. With Feed chamber/ charging, Primary Combustion Chamber. Secondary Combustion Chamber. Particulate Scrubbers, Acid Gas Scrubbers, The stack/ chimney.
Fuel oil tank storage should be Mild steel 1000 liters capacity
Chimney Height should be of 10 meters above ground level. Housing facility with one waste storage room
Provide Housing designs with adequate cross ventilation
Chamber (Afterburner Maximum exit temperature should not be less than 1100oC |
|
5. | Standard control panel
Safety interlock, Fan Starter, Burner on/ off switch/door safety switch, Auto close down switch, temperatures control mechanism. |
|
6. | Combustion Chambers
Primary Combustion Chamber Minimum exit temperature should not be less than 850oC
Secondary Combustion Maximum exit temperature should be not less than 1100oC |
SECTION VII
PRICE SCHEDULE FOR GOODS
Price schedule for Supply, Installation, Testing and Commissioning of an incinerator for Turkwel Power Station
1 | 2 | 3 | 4 | 5 | 6 |
Item | Description | Unit of sale | Quantity | Unit price | Total price |
1. | Supply, install, and commission the incinerator as specified. | LOT | 1 | ||
2. | Construct a standard incinerator housing facility as per the drawing and architectural notes provided |
LOT |
1 |
||
4. | Construct one waste storage room (provide specs on room size, construction material etc) | LOT | 1 | ||
5. | Supply / adhere to the requirement of OSHA 2007 act
49,50,51,60,61,77,78,79,80,81,100 |
LOT | 1 | ||
6. | Onsite training of Operation and Maintenance staff. | LOT | 1 | ||
7. | All the key Spares (Attach a separate List) | LOT | 1 | ||
8. | Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. | LOT | 1 | ||
9. | Supply of Operation and Maintenance Manuals. |
LOT |
1 | ||
10. | All other items not specified but necessary to complete the Installation. A separate list of these items to be attached. |
LOT |
1 |
11. | Fencing of a compound of 10 meter length by 10 meter width using Concrete poles high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) | LOT | 1 | ||
Sub Total | |||||
Discount (%) if any | |||||
Applicable Taxes and Duties | |||||
Total Cost in Kshs |
1. The double room incinerator shall rather be designed. Air distribution from the secondary and primary chamber shall be controlled between 30%-80% and 170%-120% of stoichiometric amount respectively. The combustion air shall be provided through a separate forced draft fan bookkeeping for your air provided through burners. Provision shall be made in the primary chamber to measure the water column pressure.
3. Medical incinerator maker The refractory lining of the room shall be powerful enough to sustain minimum temperature of 1000dc from the primary room and 1200 dc from the secondary room. The refractory& insulation bricks will have minimum 115mm thickness each & conform to IS:8-1983 & IS:2042-1972 respectively.
5. There will be a separate burner each for the main & secondary room. The heat input capacity of each burner will be sufficient to increase the temp.in the main & secondary chambers as 800+/50dc and 1050+/-50dc respectively in maximum of 60 minutes prior to waste charging. The burners will have automatic switching off/on control to avoid the fluctuations of temperatures beyond the essential temp.range.
– effectiveness for the treatment of placenta?
– The efficacy of process compounds (following neutralization and detoxification: solids and liquids)
(d) High level stop of transfer pump
10. A ready constructed manufactured room shall be provided for housing the incinerator. The room is going to be designed in such a manner that free space can be found on either side and heat radiation kept at minimum and providing the operators a simple workable environment and ventilation. The substances will be sufficient structural depth of mild steel angles neatly coated with metal primer and glue paint to withstand sea corrosion
7. Structural design of the chimney/stack shall be as per IS:6533-1989. The chimney/stack will be lined from indoors with minimum of 3mm thick natural tough rubber suitable for the duty requirements and will also conform to IS:4682 part I-1968 to avoid rust to acids and oxygen in the flue gas. The incinerator has to have an emergency port. The emergency port will stay closed ie. It shall not emit flue gaseous during normal operation of the incinerator. Metal fuel tank out of black steel (capacity less than 2500 litres) and will be set up in the incinerator Room. The container shall be supplied with all necessary fittings such as fill, vent, drain and overflow line, level indication and access for inspection and maintenance. Level switches shall be offered for the following services.
(a) Low level alarm
4. The incinerator casing will be produced of SS/MS plate of adequate thickness (minimum 5mm) and painted externally with heat resistant aluminum paint suitable to withstand temp.of 250 dc with proper surface preparation. Refractory lining of the hot duct will probably be done with refractory castable (minimum 45mm thick)& insulation castable(minimum 80mm thick). Ceramic wool will be used at hot duct flanges & expansion joints.
(c) Low level beginning of transfer pump
– Does it allow to treat waste or drug containing glass (whatever colour: transparent or coloured white) without causing explosions?
(b) High level alarm
– Can there be microbiological testing especially: the processing efficacy bascillus
(a) Low level alarm
(b) High level alarm
(c) Low level start of transfer pump
(d) High level stop of transfer pump
10.A ready built fabricated room shall be supplied for housing the incinerator. The room will be designed in such a way that free space is available on all sides and heat radiation kept at minimum and giving the operators an easy workable environment and ventilation. The materials will be sufficient structural thickness of mild steel angles neatly coated with metal primer and epoxy paint to withstand sea corrosion
– effectiveness for the treatment of placenta? and expired or spoiled drugs, cytotoxic and cytostatic drugs prescribed: narcotics eg
– Does it allow to treat drug or waste containing glass (whatever color: transparent or colored white) without causing explosions?
– The ability of the liquid waste treatment (blood, urine stained, other body fluids contaminated, regardless what volume packaging?
– The efficiency of process chemicals (after neutralization and detoxification: solids and liquids)
– Is there microbiological testing especially: the processing efficiency bascillus
medical waste diesel heater Burning Cost:47.5–– – – 50kg/hour.
Minimum Operating Temperature level:850 o C( key combustion).
Optimum Operating Temperature level:1450 oC( Afterburner chamber).
Second Burning Capacity: Compulsory.
Thickness Insulation:20 mm High.
Refractory Casting: Minimum 65mm.
Strong refracting lining to hold up against:1500 oC.
Regular burn out time: optimum:3 humans resources.
Fuel type: Diesel.
Gas Consumption in L/hr:7.5 to 9.
Home time in additional chamber:2 sec.
Residue ash article 100kg: Max 3.8 kg.
Gizmo for safeguarding versus communicable spatter and/or cross-contamination by securely disinfecting needles, rings, and more by infrared warmth.
Electric characteristics.
1) A 120V, 60Hz mono-phase electrical source with line connection plug NEMA 5-15 kind.
2) Defenses versus over-voltage and over-current line problems.
3) Conformity with relevant Haitian standards as well as regulations.
Operational qualities.
4) Quick complete sanitation in around 5-7 s.
5) Completely separated quartz/ceramic tube, to give safety and security for the person (no open flame).
6) Operating temperature level around 820 ° C.
7) Placed on a steady base, as per instance listed below.
Things |
Side Loading Door |
Top Loading Door |
Suggestion |
|
|
Cost |
Affordable |
High expense |
Manufacture Tech. |
Easy |
A clutter tough |
Safty |
safe |
a lot more protected |
Burner Creating |
L/ I |
L |
Filling up |
hands-on |
huge door can be by Forklift |
Land job |
little |
big |
Ash door |
exact same with feeding door or alone |
alone |
market share |
Most-CHINA/USA/INDIA |
Couple Of- UK/USA |
Dooring open type |
Hands-on |
Pry bar/Hydraulic stress and anxiety |
Dooring Open up measurement |
little |
huge |
Better for |
clinical bag waste |
pet waste |
open when shedding |
safer, can feed waste, couple of smoke |
not secure, can not feed waste, most smoke |