burner maker in china



1. Is your house time greater than 2 secs?
2. Is the primary as well as additional air preheated?
3. Could it be given as a constant system?
4. Exists a monitoring system for functional criterion? (temperature).
5. Exists an info logging system?
6. Does it offer control treatments to change waste feed, grate rate, as well as quantity, distribution and temperature level

of primary as well as added air?
7. Does it contain complementary heaters?
8. Does it consist of system that quickly stops waste feeding when melting requirements are not proper?
9. Is it possible to have a computerized bottom ash discharging system?
1. Is the main as well as likewise additional air preheated?
2. Could it be offered as a continuous system?
3. Exists an information logging system?
4. Does it attend to control treatments to change waste feed, grate speed, in addition to volume, circulation and also temperature level

of major and also additional air?
5. Does it include supporting heating units?
6. Does it include system that promptly quits waste feeding when melting criteria are not ideal?
7. Is it possible to have an automated base ash dumping system?
Incinerator.
Rated Capacity: 100/KG/Hr.
Type of Layout: Dual Chambered.
Mode of Heating: Burner



Incinerator (YD-10C)


Product Description

We’re one of the most significant waste incinerator producer and exporter of China. Pyrolytic incinerator technical is primary waste treatment method all around the world, for Medical Waste, double chambered incinerator, double chambered incinerators, double champer incineration pdf, double-chamber pyrolytic incinerators, Animal Incineration, Pet cremation and other Solid waste. Currently , we supply small and large scale incinerators as local client requirements and design updated incinerator with our top technology. 

Application Scope:  1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.  3. Community & Sea Port & Station: Municipal Solid Waste, etc.  4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Equipment Technical Specifications
Model YD-10C
Feed Capacity 40-80 kgs per feed
Burning Rate 10 kgs per hour
Burning Time per Feed 3.0 -5.0hours
Voltage 220V
Power 0.50Kw
Fuel Natural Gas or Diesel oil
Burner Italy Burner
Feed Mode Manual
Fuel consumption (Oil) 4.4-9.4 Kgs/Hour
Fuel consumption (Gas) 5.3-11.2m3/Hour
External Dimensions 170 x 140 x 160cm (mainbody)
Internal Dimensions 55 x 55 x 65cm(Primary Chamber)
Waste combustion chamber 200Liters
Post Combustion Chamber 140Liters
Oil Tank Capacity 50 Liters
Door Opening 38 x 48cm
Chimney 5.0M
Gross Weight 1200kgs
Chamber Material Refractory Concrete
Max. Heat Value 94,000Kcal/Hr.
Operation Technical Specifications
Solid Chamber temperature 800 0 C -1000 0 C
Gas Chamber temperature 1000 0 C -1200 0 C
Chamber Anti-Rate 1350 0 C
Residency time 2.0 Sec.
Burning efficiency >98%
Waste Lower Calorific Power 3000Kcal

low-cost clinical waste burner



Stack:
Kind: Cord Supported
MOC: Mild Steel of ISstd
– 5 (5) YEAR PART SERVICE WARRANTY FROM DATE OF APPROVAL
We are an aerosol manufacturing company. Our items includes Deodorants, Anti perspirant deodorants, air freshners,

Insect awesomes and so on.

Insect killers and so on.



New Courtice incinerator Strikes further Flaws


CLARINGTON — Clarington’s brand new energy-from-waste facility will probably be postponed a second time since the boilers aren’t functioning properly and the continuing startup period could cost Durham Region an extra $1 million.

“I would rather see it postponed and done right than rushed,” said Clarington Mayor Adrian Foster.

The Durham York Energy Centre centre, situated in Courtice, has been scheduled to be completely operational on Dec. 14, 2014. Now the Durham York Energy Centre is not expected to be in complete working order before the last quarter of 2015.

The significant systems of the EFW facility have been tested. The boiler temperature is high enough to the combustion process but the steam temperature isn’t high enough, and officials aren’t sure what the problem is, states Durham’s works commissioner, Cliff Curtis.

The steam temperature has to be high enough to push the turbine-generator. If the steam is too cool it can damage the turbine.

“It’s like running a car with oil,” said Mr. Curtis.

Covanta, the business building and operating the centre for Durham and York regions, has taken down the boilers for alterations, according to Mr. Curtis. It’s likely to take three weeks to the repairs and alterations. Then there’ll be a four-week demonstration period, followed by a 30-day approval test.

“We are not getting the temperature we expected out of this boiler. “It’s Covanta’s problem to deliver us the item that performs the way that they said, so they are going to select the time that they require.”

The delay means added consultant costs for construction management, legal advice and baseline ambient air monitoring. A Durham Region works report said Durham’s share of the extra costs is $1 million, which can be offered from a temporary draw on the solid waste management book fund.

“What is the last price going to look like?” “There are clearly issues with getting out it ”

Since Jan. 16, Durham has been charging Covanta a 10,000-a-day late fee for each and every day that the EFW facility is not fully operational. The invoice was delivered to Covanta, but it has not been paid yet, according to Mr. Curtis.

In mid-February, the incinerator started burning its first haul of curbside garbage. It had been a part of a testing stage before the centre opens completely.

Durham cancelled landfill contracts and started sending garbage to the Courtice centre. Some garbage was burned at the EFW plant throughout the evaluation phase, without producing power to the grid.

Until the EFW facility is up and running, the Region simply pays Covanta half price of this agreed upon per-tonne charge. But, Durham isn’t making any money before the plant is fully operational and selling electricity back on the grid.

“We are still on budget.

The plant construction is coming in slightly under budget, according to the works commissioner.

There are a number of loose ends that might end up costing Durham Region more money. There is still disagreement with former home owners on the value of this land expropriated for the facility, and a ruling is not expected until fall of next year. The final price for the utility construction and connection costs is expected in coming months. The baseline ambient air monitoring runs till the EFW facility is operational, so the delay in opening signifies an ongoing monitoring price.

“There is some minor cost over-runs on a few of the smaller items but generally we’re fiscally on track to make this in on budget and we look forward to getting it online by the end of the calendar year,” said Mr. Curtis. A key part of the economic situation for your energy-from-waste facility is dependent upon it creating electric power revenue.

The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste each year, and generate 17.5 gross megawatts of renewable energy — enough to power between 10,000 and 12,000 homes. A key part of the economic case for the energy-from-waste facility depends on it generating electrical power revenue.

from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/


hospital incinerator

* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19.    A control box ensuring the complete cycle of combustion.

20.    Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.
21.    Controls and regulations:
Control box watertight to dust, including:

* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.
22. Process Filtering system : Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or équivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22.    The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23.    The installed incinerator must bear a one year guarantee.
24.    The supplier shall perforn an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician from
the factory; it will consist of curative and preventive maintenance, and the use of machine, etc

NB.: Civil works and any other related services for the installation and training of operators must be included in the incinerator’s price.
Specification for the shelter of the incinerator: House of the incinerator inclusive in offer (the house must have facilities for hand washing and firefighting).
This material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electrical installation; concrete slab for fixing the incinerator; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; 2 metal doors ;email paintings inside and latex paintings outside the house on walls and on doors; roofing limit (planche de rive); measures for this specification will depend on the size of the incinerator which will determine the size of the shed of the incinerator., etc

Poultry Incinerator


Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combined Water Treatment
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Clover Medical source Incinerator for pet animal cremation. This equipment can burn family pet and animal, cat, bird, dog, pig, etc.. The burn around 20-300kgs a hour.

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Incinerators in Fiji


IT is a daily occurrence to see black smoke being emitted from the chimneys in the Colonial War Memorial Hospital in Suva.

And after a recent letter to the editor from Satish Nakched, The Fiji Times followed up with an investigation into the smoke which poses an obstruction to the nearby residents of Waimanu Rd..

A common belief is that the smoke is a merchandise from body components being incinerated from the hospital.

Minister of Health and Medical Services, Jone Usamate clarified “the incinerator in CWM burns all clinical waste generated at the hospital”.

“The choice of type of wastes which should be incinerated follows global standards for disease control and disposal of clinical waste,” Mr Usamate explained.

Clinical waste includes blood, tissue, individual organs and other body components.

“Incineration happens in a controlled environment where things are incinerated at a very large temperature to kill all germs from the waste.

“Incinerators are used in hospitals all around the world and will be the preferred method to dispose of this waste as it retains the chances of spreading illness and disease to a minimum.

by: http://www.fijitimes.com/story.aspx?id=334379