Burner Effective at taking care of in between 300 & & & & 500 kgs fitted with the Moist scrubber system


Automatic loading in addition to filling up with power of 10 to 12 a lot daily working with gasoline treatment approaches in addition to gas fuel in addition to also should comply with the European Standards.the Federal Government Health Care Center for Medical Waste Burner with the sticking to Requirements. They are having basic wastes such as plastic containers , wastes coming from work camps, to be incinerated, they need, 50kg/hr burner
––: toxic waste – – Other needs: Automatic waste filling system in addition to exhaust therapy system.
3. Consumption per pair: 3.2 individuals resources.
I. Primary Chamber 600- 800
1. Ability: 100kgs per batch{
(adsbygoogle = window.adsbygoogle || []).push({});|}{
(adsbygoogle = window.adsbygoogle || []).push({});|}
Amongst the significant making a choice facets of the possible provider is the power use of this technique, showed either per individual funds or daily and also I would absolutely value if such information could be made available.


Posted in incinerator-uae.