Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Incinerator A4000


Basic Info.

Model NO.:A4000
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Key Features:  * All versions with Dual combustion room.  *according to sequence * High fever, long life of incinerator.  * Free or minimal installation onsite.  * High burn rate, from 10kgs to 500kgs per hourto 6ton per day.  * PLC Control Plane. *according to order  * New Design for pet animal cremation business.  * One year warranty on incinerator and components in stock.

Items/Model A1500 A2400 A4000 A5500
Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr.
Feed Capacity *animal 120 kgs 200 kgs 300 kgs 500 kgs
Equipment Weight 7000 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 1500 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 240x170x380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 150x100x96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 500 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree

Waste Incinerators


Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:China
Production Capacity:1000 Sets Per Year

Product Description

First, we are one maker in China. We are in this field from year 2005 and in the time, we create trading company to oversea. Under assistance of our client, such as our agent in Egypt, Mr. Ibrahim, solid waste incinerator boiler producers, solid waste incinerator gas, solid waste incinerator korea, solid waste incinerator brand new hampshire, we start to expand our incinerator enterprise. We have our own workshop in Nanjing town liuhe economical zone and we have 20-30 employees. Up to now, oversea market is own main market and from year 2011, we’ll dig China market.

Abandoned Object Incinerator


Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Incinerator is a incineration gear, direct fire squander by gas fuel or oi gas. As distinct circumscription, incinerator could be termed many words as under: 

Therapy capacity: Small scale incinerator, big scale incinerator and incineration pant.  Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, individual cremators  Incinerator gas: Gas incinerator, oil incinerator  Waste to Energy (WTE): WTE incinerator, non-WTE incinerator  Incinerator Manufacturer: China incinerator maker, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.  All around the planet, in most countries, individuals anti incinerator since the incinerator will create a sizable Dioxin in the smoke. Dioxins can be published to the little scale incinerator for home, small scale incinerator for houses, small scale incinerator for solid waste, little scale incinerator for solid waste at price of $250000, environment through forest fires, backyard burning of trash, certain industrial activities, and residue from past commercial burning of waste. Dioxins break down very slowly and past releases of dioxins from both natural and man-made resources still exist in the environment. Anyhow, we must remind that, this is big scale incineration pant, generally more than 30 ton per day. This is a social problem, to examine and suggest ways in different angles in the public, government, economic development, environmental protection, technology advancement, etc..

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine


1. N95 and Disposable Mask Machine

 

2. 400mm and 1600mm Melt blown Production Line

3. ES Fiber Production Line

 

 

 

N95 Face Mask Machine Production Line

Melt blown Production Line

 

A.)Optional Ability: 1600mm

Efficiency: 95-97%

FOB Term Cost: USD per set

Cost Legitimate: 5days.

Ave.60 Days prepared for transport.

In stock Price: USD per set

 

 

B.)Optional Capacity: 400mm

Efficiency: 40-50%.

FOB Term Cost: USD per set

Cost Legitimate: 5days.

Ave.20 Days prepared for transport.

Payment: TT 70% In advance, TT 30 percent before leave factory

Shipping: 1*20′ container per set, Ave. 2000Kgs.

 

Main Parts: Extruder, mould, winder, oven, ultrasonic

Daily Capacity:100-150Kgs/24Hours

Screw extruder:100-150Kgs

Motor power: 15KW frequency conversion speed regulation Reducer speed ratio: 1:10 or 1:16 Screw length to diameter ratio: 30: 1 Screw diameter: 50mm Winding machine diameter: £ 630mm Winding machine drive motor power: 0.55kw Speed ratio of winder drive reducer (if any): 1:71 Air heater power: 15kw Power of vacuum calciner: 12kw The magnitude of vacuum calciner: 500 × 300 × 200 Ultrasonic power: 1800, frequency 28kHZ Ultrasonic spout dimension: 800 × 300 × 250

 

 



HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-20


New Courtice incinerator Strikes further Flaws


CLARINGTON — Clarington’s brand new energy-from-waste facility will probably be postponed a second time since the boilers aren’t functioning properly and the continuing startup period could cost Durham Region an extra $1 million.

“I would rather see it postponed and done right than rushed,” said Clarington Mayor Adrian Foster.

The Durham York Energy Centre centre, situated in Courtice, has been scheduled to be completely operational on Dec. 14, 2014. Now the Durham York Energy Centre is not expected to be in complete working order before the last quarter of 2015.

The significant systems of the EFW facility have been tested. The boiler temperature is high enough to the combustion process but the steam temperature isn’t high enough, and officials aren’t sure what the problem is, states Durham’s works commissioner, Cliff Curtis.

The steam temperature has to be high enough to push the turbine-generator. If the steam is too cool it can damage the turbine.

“It’s like running a car with oil,” said Mr. Curtis.

Covanta, the business building and operating the centre for Durham and York regions, has taken down the boilers for alterations, according to Mr. Curtis. It’s likely to take three weeks to the repairs and alterations. Then there’ll be a four-week demonstration period, followed by a 30-day approval test.

“We are not getting the temperature we expected out of this boiler. “It’s Covanta’s problem to deliver us the item that performs the way that they said, so they are going to select the time that they require.”

The delay means added consultant costs for construction management, legal advice and baseline ambient air monitoring. A Durham Region works report said Durham’s share of the extra costs is $1 million, which can be offered from a temporary draw on the solid waste management book fund.

“What is the last price going to look like?” “There are clearly issues with getting out it ”

Since Jan. 16, Durham has been charging Covanta a 10,000-a-day late fee for each and every day that the EFW facility is not fully operational. The invoice was delivered to Covanta, but it has not been paid yet, according to Mr. Curtis.

In mid-February, the incinerator started burning its first haul of curbside garbage. It had been a part of a testing stage before the centre opens completely.

Durham cancelled landfill contracts and started sending garbage to the Courtice centre. Some garbage was burned at the EFW plant throughout the evaluation phase, without producing power to the grid.

Until the EFW facility is up and running, the Region simply pays Covanta half price of this agreed upon per-tonne charge. But, Durham isn’t making any money before the plant is fully operational and selling electricity back on the grid.

“We are still on budget.

The plant construction is coming in slightly under budget, according to the works commissioner.

There are a number of loose ends that might end up costing Durham Region more money. There is still disagreement with former home owners on the value of this land expropriated for the facility, and a ruling is not expected until fall of next year. The final price for the utility construction and connection costs is expected in coming months. The baseline ambient air monitoring runs till the EFW facility is operational, so the delay in opening signifies an ongoing monitoring price.

“There is some minor cost over-runs on a few of the smaller items but generally we’re fiscally on track to make this in on budget and we look forward to getting it online by the end of the calendar year,” said Mr. Curtis. A key part of the economic situation for your energy-from-waste facility is dependent upon it creating electric power revenue.

The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste each year, and generate 17.5 gross megawatts of renewable energy — enough to power between 10,000 and 12,000 homes. A key part of the economic case for the energy-from-waste facility depends on it generating electrical power revenue.

from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/